My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 - DRAINAGE
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
06 JUNE
>
06/27/2016
>
17 - DRAINAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 3:35:06 PM
Creation date
6/23/2016 1:35:18 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
View images
View plain text
TENTATIVE DRAINAGE WORK PLAN <br />CIP crew: <br />06/06 -06/17 Complete drainage replacement at 25th NE and Ridgeview <br />06/20/ -06/24 Clearing & grubbing, install approx. 140 feet storm drain pipe 32nd NE and Ridgeview <br />06/27 -08/05 Excavation of Buttermilk Creek north to Clarksville, plus erosion control & reseeding <br />08/08 -12/02 Excavation of Big Sandy Creek northwest to Sycamore, plus erosion control & reseeding, <br />including bridges @ Dragon Park <br />Water & sewer crew: <br />06/20 -08/05 6th SE to 8th SE either side of Sycamore, clearing & grubbing <br />Pa rks: <br />05/23 -06/17 5th SE, from Clarksville to Washington; Culbertson <br />Streets: <br />05/23 -06/10 Ditch excavations 12th SE <br />07/05 -08/26 Ditch excavations, 12th SE, 6th SE, 8th SE, Old Jefferson <br />TBD Aikin Elementary <br />TBD Plum Street, & culverts on 25th NW <br />TBD 7th NW @ Bonham <br />TBD 500 blocks of Clarksville & Lamar <br />r'nntrartnr- <br />06/13 -06/24 Replacement bridge on S Church <br />05/23 -07/08 Clearing & grubbing, 3`d NW to Center <br />05/23 -07/15 Clearing & grubbing, 12th SW, from Bonham to Washington; area north of Bonham, with <br />TXDOT cooperation <br />07/05 -07/15 Washed out bridge @ Fairfax <br />07/11 -08/26 Clearing & grubbing, Paradise Estates, Old Clarksville north to Clarksville <br />07/18 -08/12 Clearing & grubbing, Clement, from N. Main to Loop 286 <br />Communitv service workers & volunteers: <br />TBD Various locations for clearing & grubbing, debris removal, mowing, etc. <br />Capital projects requiring engineering and bond funding: <br />24th SE, encompassing Culbertson, 26th SE, Clark, Lamar (dentist, Sonic) & Wade Park (retention pond) <br />E. Center Street & Park Place, likely needs retention pond <br />Downtown WPA drainage from plaza area, under Farmer's Market, southwest towards old hospital, etc. <br />Old Jefferson & South Paris Baptist <br />Johnson Woods; under design as part of Utilities Bond project; scheduled for 2017 bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).