Laserfiche WebLink
ANNUAL REPORTS /BUDGET NEEDS SUMMARY LIST <br />Public Works <br />Lake Crook road /bridge <br />Drainage <br />Road maintainer <br />Garbage truck <br />Parks & drainage employee <br />Pool improvements <br />Parks plan; soccer, et al in West Paris <br />Utilities <br />Increased cost for USACE 0 &M <br />New headworks /mechanical bar screen <br />Replacement of basement flooring <br />Replace two transfer pump valves. <br />Surface coating for the 2.0 million gallon ground storage tank and the backwash tower at WTP <br />Rebuild one pump at ground storage; rebuild two sludge transfer pumps; replace filter surface pump <br />Rebuild pumps at Campbell's and Woodard lift stations <br />Rebuild pumps and replace valves at the flow equalization basin. <br />Engineering <br />ADA transition plan <br />International Property Management Code <br />Other codes, construction standards, standardized contracts <br />Development review committee <br />Permitting fees <br />Airport hangar <br />Downtown improvements <br />Finance <br />City hall renovations /repairs <br />Public information office /PEG funds <br />EMS <br />Architect for station design <br />Library <br />Roof <br />Artwork <br />