My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/23/2016 MINUTES
City-of-Paris
>
Boards and Commissions
>
BUILDING AND STANDARDS COMMISSION
>
1979-2016
>
2016
>
05/23/2016 MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 4:43:05 PM
Creation date
6/27/2016 4:39:00 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
power lines would interfere with the scaffolding. The equipment (towers) has to <br />come off so the roof can be repaired, which is necessary to repair the other walls. <br />Cannot fix the building as long as the towers are on the roof. Only have a 2 -year <br />window to do the repairs. Attorneys have not been cooperative; we never <br />instructed them where to put the power. <br />Johnny Norris - This commission can only deal with the substandard condition <br />of the west wall. <br />Ken Kohls - Comments have been made that you do not want the towers on the <br />building. <br />David Alarid - I don't care; I just want to be able to repair the building. <br />David Isbell - Regarding the repairs, the penthouse has to be repaired, and this <br />cannot be done with the towers attached to it. Major conduit has to be removed. <br />Johnny Norris - BSC will deal with the west wall. <br />Melanie Okon - Will leave copies of a -mails of communications with Owner's <br />attorney regarding power. <br />James Litzler - Have rebuttal e- mails. <br />Johnny Norris - At end of 90 days, will it come back to BSC? <br />Robert Talley - Yes. Recommend repair within 90 days of west wall or back to <br />BSC. Repair may involve demo of veneer. <br />Ken Kohls - Would like that re- worded to repair west wall to be satisfactory and <br />safe for citizens of Paris. <br />Motion was made by Ken Kohls, seconded by Sally McEwin to accept Robert <br />Talley's recommendation, with re- wording by Ken Kohls. Motion carried <br />unanimously. 5 -0 <br />3. Adjournment. <br />Motion was made by Sally McEwin, seconded by Ben Vaughan to adjourn the <br />meeting at 4:45 pm. Motion carried unanimously. 5 -0 <br />APPROVED THIS 27th DAY OF JUNE, 2016. do <br />/I'- 'ehairmafi <br />
The URL can be used to link to this page
Your browser does not support the video tag.