My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - MINUTES OF VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
07 JULY
>
07/11/2016
>
06 - MINUTES OF VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:36:01 PM
Creation date
7/7/2016 11:37:53 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
power lines would interfere with the scaffolding. The equipment (towers) has to <br />come off so the roof can be repaired, which is necessary to repair the other walls. <br />Cannot fix the building as long as the towers are on the roof. Only have a 2 -year <br />window to do the repairs. Attorneys have not been cooperative; we never <br />instructed them where to put the power. <br />Johnny Norris — This commission can only deal with the substandard condition <br />of the west wall. <br />Ken Kohls — Comments have been made that you do not want the towers on the <br />building. <br />David Alarid — I don't care; I just want to be able to repair the building. <br />David Isbell — Regarding the repairs, the penthouse has to be repaired, and this <br />cannot be done with the towers attached to it. Major conduit has to be removed. <br />Johnny Norris — BSC will deal with the west wall. <br />Melanie Okon — Will leave copies of a -mails of communications with Owner's <br />attorney regarding power. <br />James Litzler — Have rebuttal e- mails. <br />Johnny Norris — At end of 90 days, will it come back to BSC? <br />Robert Talley — Yes. Recommend repair within 90 days of west wall or back to <br />BSC. Repair may involve demo of veneer. <br />Ken Kohls — Would like that re- worded to repair west wall to be satisfactory and <br />safe for citizens of Paris. <br />Motion was made by Ken Kohls, seconded by Sally McEwin to accept Robert <br />Talley's recommendation, with re- wording by Ken Kohls. Motion carried <br />unanimously. 5 -0 <br />3. Adjournment. <br />Motion was made by Sally McEwin, seconded by Ben Vaughan to adjourn the <br />meeting at 4:45 pm. Motion carried unanimously. 5 -0 <br />APPROVED THIS 27th DAY OF JUNE, 2016. ae 1,7-"-� De�a� <br />/� Chairm <br />
The URL can be used to link to this page
Your browser does not support the video tag.