My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 - SURVEILLANCE CAMERA PROJECT
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
08 AUGUST
>
08/22/2016
>
18 - SURVEILLANCE CAMERA PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:23:18 PM
Creation date
8/18/2016 3:15:51 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 18 <br />memorandum <br />TO: City Council <br />John Godwin, City Manager <br />FROM: Bob Hundley, Chief of Police <br />SUBJECT: SURVEILLANCE CAMERA PROJECT <br />DATE: August 11 t", 2016 <br />BACKGROUND: In budget presentations, the police department proposed a 24 camera <br />surveillance system for the city. These cameras were to be placed in public areas around the <br />community to assist in the investigation of criminal acts. Council requested to bring back an <br />initial cost of the system with fewer cameras primarily for the downtown area with the ability to <br />grow the system in phases. <br />STATUS OF ISSUE: We have received an estimated cost for the installation of the <br />infrastructure and six cameras from one vendor in the amount of $49,800.00. The server and <br />initial infrastructure at the police department could handle up to 32 cameras. The cost for adding <br />additional cameras to the system would be dependent on the locations selected. The system <br />operates on `point to point' connectivity. Any camera placement that could not link to the initial <br />`broadcaster' would require another connective point. The connecting point equipment is $6000 <br />for each site along with the cost of the additional cameras at $1200 each. The initial system <br />comes with a 5 -year maintenance contract. <br />BUDGET: The impact to the budget would be an additional cost of $49,800 <br />RECOMMENDATION: Presentation and provide direction to staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.