My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - MINUTES FROM VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
10 OCTOBER
>
10/24/2016
>
06 - MINUTES FROM VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 1:38:29 PM
Creation date
10/20/2016 1:20:56 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIKO V <br />DESIGNING CONFIDENCE <br />MEETING TO DISCUSS REPAIR PROCEDURES <br />of the Multi Story Building at <br />104 Bonham Street <br />Paris, Texas <br />May 25, 2016 <br />Questions and Issues for all parties (initial questions may not be final): <br />Cell Companies: <br />1. Has an actual signal strength test been done to determine the true ramifications of <br />not having these towers active? This could be as simple as a "Can you hear me now" <br />test by turning power off to the towers for a very short time and canvasing the <br />downtown area for service. I would imagine that the cell company has other more <br />sophisticated methods, but we need something done to verify what would happen in <br />the event of power going off to the towers, not just scare tactics and conjecture. <br />2. Please identify each piece of equipment on the roof and it's purpose. Can we <br />consolidate or reduce in size some equipment or even eliminate some of it? Attached <br />is a plan of the roof done by T- Mobile that can be used to identify each piece. <br />3. Can the existing equipment be installed on a single pole that is cantilevered from <br />the roof structure to minimize the amount of space on the roof required by the cell <br />equipment? <br />4. Where can the antennas mounted on the penthouse roof be moved to. We must <br />repair those walls and cannot do so with the antennas located where they are at this <br />time. <br />5. Can the equipment be moved off the roof for a period of time to allow repair of the <br />building and re-roofing? If not, can it be moved around to facilitate these repairs <br />and how long would that take? This also applies to all the conduit mounted on the <br />walls and parapets. <br />6. Can the power to the towers be relocated to inside a chase in the building or up the <br />north wall? <br />7. Can the fiber optics lines on the north be relocated and to where? <br />8. How many volts does the conduit carry coming up the south wall? <br />9. Can all 911 calls be re-routed to another cell to make sure service for that service is <br />not interrupted? <br />940 458 7503 1405 W. CHAPMAN DRIVE SANGER, TEXAS 76266 -9076 EIKONCG.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.