K ON <br />DESIGNING CONFIDENCE <br />MEETING NOTES ON <br />REPAIR PROCEDURES <br />of the Multi Story Building at <br />104 Bonham Street <br />Paris, Texas <br />May 26, 2016 <br />Persons in Attendance: <br />Jud Stringer, BAD Company (Demolition) <br />Don Walters, BETCO Scaffolds <br />Jamie Pereyra, BETCO <br />James Reed, AT &T <br />Preston Spurlin, MSTI <br />Kendall Cook, Metro PCS/T- Mobile <br />Richard Moore, Blackwater Communications <br />Jeff Key, Oncor <br />Rudy Rodriquez, Castro Roofing <br />David K. Isbell, P.E., EIKON Consultant Group <br />Nathan McQuillan, EIKON Consultant Group <br />Summary of Discussion: <br />1. It was determined how to run service to the existing meter on the south wall and <br />also install scaffolding. All parties agreed to this temporary solution. <br />2. The method of getting permanent power to the building was discussed and agreed to <br />pending the City approval. This could take approximately 6 months from when the <br />process is started. When this occurs, the cell equipment will be powered by the <br />permanent power through a chase and the temporary service removed from the <br />south wall. This will happen after the building has been abated for asbestos. <br />3. A plan for reroofing with the existing equipment moved around and reconfigured <br />was discussed and agreed to by all parties. <br />4. Repair work for the west wall could begin in a few days and should take 2-3 months. <br />5. It was understood that the owner still had to agree to this plan and direction. <br />6. There would be no additional costs to the owner due to the equipment being left on <br />the roof if this plan is followed. <br />940.456.7503 1405 W. CHAPMAN DRIVE - SANGER, TEXAS 76266 -9076 EIKONCG.COM <br />