My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - MINUTES FROM VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
10 OCTOBER
>
10/24/2016
>
06 - MINUTES FROM VARIOUS BOARDS, COMMISSIONS, AND COMMITTEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 1:38:29 PM
Creation date
10/20/2016 1:20:56 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/26/16 meeting. Mr. Alarid then stated that in a building with asbestos, the <br />asbestos has to be abated before work can be done on the building. Just the west <br />wall cannot be worked on because asbestos will be distributed if that wall is <br />disturbed. He said that the building has to be sealed and abated, and that you <br />cannot work on the roof or wall unless asbestos is abated. Mr. Alarid said that <br />the emails from the State Fire Marshal read here today were only a part of the <br />emails exchanged. The State Fire Marshal said in any city with a local fire dept, <br />they do not get involved. They came out as a courtesy. He said that Page 2 of <br />his handout states the cell phone companies refuse to cooperate and no contractor <br />will work on the building with cell towers placed on the roof. Mr. Aland stated <br />that Mr. Isbell was fired after the last BSC meeting, so he was not authorized to <br />communicate on Mr. Alarid's behalf after that meeting. Mr. Alarid then said <br />that The Western Specialty Contractors estimate states relocation of electrical <br />microwave and telecommunication must be removed before work can begin and <br />that the power must be shut off. Mr. Alarid then said that BAD Demolition, in <br />its bid under "Scope of Work," states all power and water must be de- energized <br />for safe access. Mr. Alarid said he was told the cell towers on roof are secondary <br />power, not primary. He said that when he purchased the building, power was <br />turned off to the towers and it was 2 weeks before he heard from the cell phone <br />companies. During that time, 911 and cell service was not interrupted. Mr. <br />Alarid then stated that City Code requires the building be "red tagged," and that <br />the BSC has that authority. <br />Mr. Norris addressed Mr. Alarid and said that when Mr. Alarid was before the <br />commission the first time and the commission issued the 90 -day repair order, the <br />commission asked him if he could do that, and he said yes. Mr. Norris said, now <br />Mr. Alarid was back more than 90 days later had still not done any repairs on the <br />building. David Alarid said that if the building was "red tagged" today, it could <br />be done, but if the building was not "red tagged," no contractor will do the work. <br />Mr. Alarid said that Code enforcement failed to do its job. He said that he has to <br />repair the building, but he cannot do the repair unless the building is "red tagged." <br />Mr. Richards said that in May, Mr. Alarid said he could not begin work on the <br />west wall so long as the cell towers were on the roof, and Mr. Isbell stated in the <br />5/26/16 meeting that power could be re- routed. Mr. Richards asked if re- routing <br />the power would work. Mr. Alarid said Mr. Isbell put that info together after he <br />was fired and that there's also conflicting information from Mr. Isbell in 3 <br />separate reports. Mr. Alarid said that Code Enforcement did not "red tag" the <br />building, so he cannot do the repairs. <br />Mr. Kohls addressed Mr. Alarid and said that three months ago, the commission <br />told Mr. Alarid that he was to fix the building. Mr. Kohls further inquired as to <br />why the building was not repaired. Mr. Alarid replied that he did not repair the <br />building because it wasn't "red tagged." He stated that contractors cannot work <br />on the building if there's power to the building. Mr. Norris asked if a building <br />permit was issued. David Alarid said yes, that a permit was issued to fix the wall <br />and repair the roof and replace the 1St floor facade. Mr. Norris asked if Mr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.