My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 - EMS STATION ARCHITECT
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
10 OCTOBER
>
10/24/2016
>
16 - EMS STATION ARCHITECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 1:39:26 PM
Creation date
10/20/2016 1:35:24 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 16 <br />memorandum <br />TO: Mayor & City Council <br />FROM: John Godwin, City Manager <br />SUBJECT: EMS STATION ARCHITECT <br />DATE: October 14, 2016 <br />BACKGROUND: At the October 10 council meeting, the council tabled hiring an architect who <br />would provide necessary design and related services for construction of a new EMS station in <br />northwest Paris. As I mentioned on the 10th, we have been in contact with three firms, and I am <br />sure all can do the job. I recommended Ron Hobs Architects from Garland because they are the <br />most experienced of the three, and also because I have worked directly with them in the past on <br />other successful municipal projects, which is their particular specialty. <br />STATUS OF ISSUE: I did not factor in any extra "credit" for a local firm, but based my initial <br />recommendation only on qualifications and experience. The new station, located on 19th NW, <br />will replace the one now located inside PRMC. The structure will be very simple, essentially a <br />metal building with two ambulance bays, a dayroom and kitchen, and two bedrooms, so using a <br />public safety- experienced firm is not a prerequisite to success. Price should be about the same <br />from any of the three, though we may not base the selection on price in any case. <br />BUDGET: Up to $30,000 has been included in the 2016 -17 operating budget. <br />RECOMMENDATION: Authorize city manager to execute an agreement with a preferred <br />architectural firm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.