Laserfiche WebLink
2017 -2018 Materials Bid Tabulation <br />Item <br />Coston & Sons <br />Ergon Asphalt <br />Krogman <br />Martin Marietta <br />Richard Drake <br />SCS Materials <br />Ready Mix <br />David Stroud <br />Luke Krogman <br />Tim Stone <br />Reggie Horton <br />Steve Cope <br />Trava Drake <br />11612 RM 2244 <br />POB 1336 <br />POB 1010 <br />6290 Hwy 271 N <br />5020 SE Loop 286 <br />155 E Oak <br />Building 1, Ste 250 <br />Pairs TX 75461 <br />Powderly TX 75473 <br />Powderly TX 75473 <br />Paris TX 75460 <br />Paris TX 75460 <br />Austin TX 78738 <br />903.784.8627 <br />580.326.0406 <br />903.732.4781 <br />903.249.3530 <br />903.784.2321 <br />512.469.9292 <br />Stone Type B, Grade 4 Uncoated <br />NO BID <br />NO BID <br />NO BID <br />$38.00 <br />NO BID <br />$32.56 <br />Stone Type B, Grade 5 Coated <br />NO BID <br />NO BID <br />NO BID <br />$68.00 <br />NO BID <br />NO BID <br />Stone Type B, Grade 5 Uncoated <br />NO BID <br />NO BID <br />NO BID <br />$40.00 <br />NO BID <br />NO BID <br />Stone Type B Modified Grade 5 <br />NO BID <br />NO BID <br />NO BID <br />$28.50 <br />NO BID <br />$28.06 <br />Uncoated <br />CRS -2 Emulsion Asphalt <br />NO BID <br />$1.8220 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Hot Mix Cold Laid Asphalt Type "A" <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />$70.90 <br />$71.00 <br />Hot Mix Cold Laid Asphalt Type "B" <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />$64.55 <br />$66.50 <br />Hot Mix Cold Laid Asphalt Type "D" <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />$69.20 <br />$68.50 <br />Portland Cement Concrete 5 Sack <br />$107.00 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Portland Cement Concrete 6 Sack <br />$112.00 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Portland Cement Concrete <br />$107.00 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Grout 5 Sack <br />Portland Cement Concrete <br />$112.00 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Grout 6 Sack <br />SS -1 Emulsion Asphalt (Tack Oil) <br />NO BID <br />$1.8720 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Sand <br />NO BID <br />NO BID <br />$10.00 <br />NO BID <br />$9.90 <br />$13.56 <br />Top Soil <br />NO BID <br />NO BID <br />$10.00 <br />NO BID <br />$11.00 <br />NO BID <br />Flexible Base (White Rock) <br />NO BID <br />NO BID <br />$15.25 <br />$16.00 <br />$15.75 <br />NO BID <br />eral Environmental Fee will be added to above prices at a rate of $.49770/ton for asphalt and polymer loads or $.00150 /gal for emulsion loads. <br />ll transport loads of 5,500 gallons. Freight is based on a full transport load, even if a full load of material is not ordered. The common carrier bills <br />L <br />at $80 per hr. after the second hr. Return freight is 1/2 of the outgoing tariff. Pump and hose charge is $80 per load. <br />