My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/18/2011 MINUTES
City-of-Paris
>
Boards and Commissions
>
AIRPORT ADVISORY BOARD
>
1972-2016
>
2000-2015
>
2011
>
08/18/2011 MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 4:00:02 PM
Creation date
2/20/2017 4:00:02 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Approval of minutes_ from previous meeting. (May 19, 2011) <br />Motion was made by Steve Gilbert, seconded by Phillip Payne to approve the minutes for <br />the May 19, 2011 meeting. Motion carried 7 -0. <br />4. Report from PEDC: <br />A. Review Recent Marketing for AirportAlndustrial Park. <br />Steve Gilbert presented a copy of a two page spread in Expansion Solutions <br />Magazine's aviation section. Mr. Gilbert further stated they took content from the <br />master plan and worked with the magazine putting together the advertisement. <br />Additionally, as a part of this deal they received reprints of the ad and the <br />company will take the ads and develop a brochure and present it at trade shows. <br />PEDC has also arranged for two photographers to fly over Paris and take aerial <br />pictures of different locations as a marketing tool. Anyone who may be interested <br />in doing the fly over please contact Steve, or Shawn and let them know. <br />S. Report from Shawn Napier, Airport Director: <br />A. Update on Master Plan status. <br />The only thing not approved, is the airport lay out plan. Currently it has been <br />submitted to TXDOT, and we look to hear from them possibly in December to two <br />or three months after that. Looking at the Capital Improvement plan we received <br />some good news at the pre pavement meeting for the main runway that was held at <br />the Airport. One of the TXDOT aviation officials Stacie Clyber stated that they <br />had a lot of major projects cancel on them and they are looking to bump some <br />people up. So we are looking at sending our first payment by October 1 to TXDOT <br />to start the Phase II portion of the airport project. <br />B. Status of Airport Improvements. <br />They have finished the overlay of the main runway and are currently working on <br />the lighting which will take another two to three weeks. The striping crew will be <br />in on Monday to do the striping for the runway. They will also be coming back to <br />repair the concrete that was damaged in front of Bill Booth's hangar and the other <br />areas as well. Any issues you see we will try to address in the Phase II part of the <br />project. <br />6 Report from Jerry Richey, Airport Manager: <br />A. Status of TerminalAHangar Improvements. <br />Jerry Richey stated they have installed new carpet, purchased new chairs for the <br />terminal building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.