My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-20-Minutes
City-of-Paris
>
Boards and Commissions
>
PEDC
>
1993-2016
>
2002
>
2002-11-20-Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:44 PM
Creation date
2/21/2017 11:49:46 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2002
Doc Type
Minutes
CITY CLERK - Date
11/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gary Vest <br />Proposal for Master Planning Services <br />Paris Business Park <br />November 19, 2002 <br />PAGE 3 <br /> <br /> 6. This activity will be completed within thirty days of receiving Notice to Proceed <br /> and all record documents from Paris Economic Development Corporation. <br /> <br /> 7. The fee for this activity is: <br /> <br /> Graeber, Simmons & Cowan: $8,000 <br /> <br /> B. BUSINESS PARK DEVELOPMENT STANDARDS <br /> <br /> 1. Consult with PEDC to determine the desired business types to be recruited to <br /> the new park. <br /> <br /> 2. Based on the stated goals, objectives, requirements and desired business types <br /> to be recruited, review and select appropriate limitations and standards for <br /> building and site design for future developments to be located within the park. <br /> Typical elements such as floor: area ration (FAR), building heights and setbacks, <br /> exterior material selections, parking and loading requirements, storage yard <br /> screening, landscaping, and signage will be included in the development <br /> standards. The standards will complement the proposed zoning for the <br /> property. Included in this activity is the development of by-laws and covenants <br /> for the establishment of a property owners' association to govern the <br /> maintenance and perpetual preservation of the common areas of the park. It is <br /> anticipated that consultation and review for items 1 and 2 will consist of one <br /> two-hour meeting with Paris Economic Development Corporation. <br /> <br /> 3. Prepare, for approval by PEDC, a written outline of standards to be enforced <br /> and imposed on all future development in the park. <br /> <br /> 4. This activity will be completed within forty-five days of receiving Notice to <br /> Proceed from PEDC. <br /> <br /> 5. The fee for this activity is: <br /> <br /> Graeber, Simmons & Cowan: $5,000 <br /> <br /> C. BUSINESS PARK ENTRANCE IMAGE/SITE IDENTIFICATION DESIGN <br /> <br /> With the approval of the Business Park Master Plan, the new park entrance image/site <br /> identification design can be completed. This activity includes the following operations:' <br /> <br /> 1. Prepare studies to establish the design concept of the site identification, <br /> indicating the size, location, types and quality of materials. It is anticipated that <br /> the entry plan will include landscaping, lighting 'and irrigation systems. <br /> <br /> 2. Prepare, for approval by PEDC, plans, sketches and other documentation as <br /> may be deemed necessary to indicate the proposed site identification elements. <br /> The proposed design will be reviewed with PEDC during one two-hour meeting <br /> to finalize all plans. <br /> <br /> 3. Complete, based on approval from PEDC, construction documents includi.ng <br /> plans and specifications for the construction of the approved park entrance and <br /> site identification elements. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.