Laserfiche WebLink
<br /> Director GUest announced that the next item on the agenda was. accepting a <br /> proposal for engineering services for the Paris Business Park and approving and <br /> authorizing the execution of an engineering services agreement. · <br /> <br /> Mr. Vest advised that two proposals were received for the engineering services <br /> for the Paris BUsiness Park. Both Hayter Engineering and Adams Consulting <br /> Engineering proposals cover the same scope of work which includes all of the <br /> engineering design, streets, water, sewer, and all of the infrastructure needed <br /> including the hydraulics for water runoff and those type of things. Mr. Vest said <br /> the survey has already been completed by Hayter Engineering and a contour <br /> map of the Industrial District has already been done. Hayter came back with a <br /> proposed contract.with a total cost for Hayter to do all of these things for <br /> $124,900.00. Mr. Vest received this proposal on February 25, 2003. He <br /> thought it was excessive; so he contacted Adams Consulting Engineering and <br /> he received a Proposal from them in the amount of $57,000.00 for doing the <br /> same scope ofwork. <br /> <br /> A motion was made by Director Wall, seconded by Director Severson, to accept <br />-- the proposal of Adams Consulting Engineering. The motion carried 4 ayes, 0 <br /> nays. . <br /> <br /> Resolution NO. 2003-005, accepting a proposal from Adams Consulting <br /> Engineering for engineering services, related to the Paris Business Park; <br /> authorizing a professional services agreement in accordance with said proposal; <br /> making'other findings and provisions related to the subject; was presented. A <br /> motion was made by Director. Wall, seconded by Director Severson, for <br /> approving the resolution. The motion carried unanimously. <br /> <br /> <br />