Laserfiche WebLink
905 <br /> <br />Paris Business Park DEVELOPMENT STANDARDS <br />Paris, Texas Paris Economic Development Corporation. <br /> <br /> One member of the City of Paris Planning and Zoning staff <br /> <br /> Three property owners in Paris Business Park. <br /> <br /> 2. 4. 0 Procedures <br /> <br /> Owners shall submit documents in accordance with the following procedures, or as otherwise directed <br /> by the DRB. Do not submit documents for ordinary maintenance, repairs, replacements in kind, and <br /> interior modifications unless they affect the safety, security, structural integrity, or exterior appearance <br /> of the property or any improvements on the property. Contact the DRB to resolve any question of <br /> procedure, clarification of compliance requirements, or to obtain copies of the Improvement Submittal <br /> Form. It it strongly rocommended that the Owner complete the DRB submittal review process prior to <br /> submitting documents for governing agency review and approval. Upon completion of the DRB review <br /> process, the Owner shall submit documents to the Building Department of the City of Paris for all <br /> necessary permits. <br /> <br /> 2A. 1 New Construction <br /> <br /> At least thirty (30) working days prior to starting any improvements on the property, the <br /> Owner shall submit design documents describing the proposed improvements. That submittal <br /> shall include full design development drawings in 24"x36'* format including phasing plans, <br /> floor plans, elevations, sections, and diapams, and outline specifications in 8-1/2"x11" format <br /> to the DRB along with the Improvement Submittal Form. The Owner shall clearly indicate any <br /> deviations from these standards in the Improvements Submittal Form. The DRB will require a <br /> minimum often (10) copies of all submittal documents for review. <br /> <br /> The DRB will review the design for compliance with those standards and notify the Owner <br /> within fourteen (14) working days of any discovered non-compliance. <br /> <br /> The Owner shall make any changes to the design of the improvements necessary for full <br /> compliance and then submit complete construction documents including detailed plans, <br /> elevations, sections, schedules, and specifications and all construction details along with the <br /> Improvement Submittal Form. These construction documents shall be prepared and sealed by <br /> Architects, Landscape Architects, Civil Engineers and/or Structural Engineers licensed to <br /> practice by the State of Texas. The Owner shall clearly indicate any deviations from these <br /> standards in the Improvements Submittal Form. <br /> <br /> The DRB will review the submitted documents for compliance with these standards and notify <br /> the Owner within fourteen (14) working days of any discovered non-complinnce. <br /> <br /> The Owner shall nmke any changes to the design of the improvements necessary for full <br /> compliance before beginning any improvements on the property. <br /> <br /> 2.4.2 Renovations and Additions <br /> <br /> Follow the procedure for new construction, item 2.4.1, above, but indicating whether the <br /> improvement is a renovation or an addition in the Improvement Submittal Form. <br /> <br /> 2.4.3 Record Documents <br /> <br /> The Owner shall Submit Record Documents ofthe improvements within thirty (30) calendar <br /> days oftbe Owner's beneficial occupancy or use of the improvement. These will include, as <br /> accurately as reasonably possible, locations of all above ground utilities, underground utilities <br /> (including irrigation lines), buildings, structures, paving areas, roadways, driveways, <br /> walkways, landscape features and civil protuberances or devices. These documents shall be <br /> blueline or other clear, readable copies in 24"x36" format to be held in DRB files for its future <br /> reference and use. <br /> <br /> 2.4.4 Variances <br /> <br /> By indicating deviations from these standards in the Improvements Submittal Form, the Owner <br /> is requesting a variance or assistance in obtaining compliance. The DRB, at its option, may <br /> <br />Graeber, Simmons & Cowan Pnge 4 of 30 1/9/03 <br />200209400 <br /> <br /> <br />