My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 - TXDOT LOCAL GOVERNMENT PROJECTS QUALITY ASSURANCE PROGRAM
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2017
>
02 - FEBRUARY
>
02/27/2017
>
12 - TXDOT LOCAL GOVERNMENT PROJECTS QUALITY ASSURANCE PROGRAM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 2:15:17 PM
Creation date
2/23/2017 2:11:16 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If an individual fails to qualify on a specific test method or the qualification is revoked, the individual must <br />obtain additional training before the individual can retest on that specific test. <br />In addition, for tests requiring a split/proficiency sample evaluation, the individual must participate in <br />split/proficiency samples given by the qualification authority to validate the qualification. The results of the <br />samples will be evaluated with acceptable tolerance limits. If the comparisons of the test results do not <br />comply with the tolerances, an engineering review of the test procedures and equipment will be performed <br />immediately to determine the source of the discrepancy. Corrective actions must be identified and <br />incorporated as appropriate, prior to the individual performing additional testing on that test method. <br />Under unique circumstances, the qualification authority may grant a verbal examination upon request. The <br />reason(s) for requesting a verbal examination must be presented and documented prior to the individual <br />being allowed to take the examination. <br />Unless otherwise stated, qualification of an individual is valid for not more than three years, after which the <br />individual must be re- qualified. Under the Independent Assurance (IA) system approach, interim <br />evaluations will be required as specified in "Frequency of System Approach Independent Assurance <br />Testing." <br />6.6 Documentation <br />The LG and IA are responsible for maintaining documentation of all individuals qualified under their <br />authority who perform required tests for acceptance of materials. Area offices must also maintain copies of <br />the certificates for individuals performing testing on projects under their supervision. <br />Documentation to be maintained by the LG and IA laboratory includes: <br />A. Sampling and testing personnel qualification form —a form for each individual listing all the tests the <br />individual has been qualified to perform; <br />B. Qualification worksheet —a form listing the key elements of the test method (The evaluator <br />conducting the observation uses the form to record the results.); <br />C. Copy of qualification certificates issued; and <br />D. Copies of written examinations. <br />Documentation retention will be for the life of the qualification. Qualification authority must be shown on the <br />certificate given to each individual. <br />6.7 Disqualification <br />Accusations of neglect or abuse of the rights and responsibilities are made to the LG /RPIC. The difference <br />between neglect and abuse is intent and shall be determined by the LG /RPIC. <br />Penalties are implemented upon recommendation by the district engineer, and the penalties range from a <br />minimum of ninety days suspension to a maximum of permanent revocation of the certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.