Laserfiche WebLink
<br />Form 6b. Project Cost Evaluation (add additional pages as necessary) <br /> <br />Our total cost for the addition of two inches of overlay is shown below: <br /> <br />Materials For Grant Request <br /> <br />810 tons of black base $28.00 per ton <br />(2" overlay of300' x 300' area) <br /> <br />$22,680.00 (grant request) <br /> <br />6400 gallons CRS-2 emulsion oil 0.6711 per gallon <br /> <br />4.295.00 (l.1rant request) <br />$26,975.00 (total grant request) <br /> <br />(Materials As In-Kind) <br /> <br />2000 tons cover stone 12.15 per ton $24,300.00 (in kind) <br /> Equipment (In-Kind) <br />Maintainer (I) 16 hrs @ $50.00 hr. $ 800.00 <br />Roller (I) 16 hrs @ $35.00 hr. 560.00 <br />Oil Truck (1) 16 hrs@ $45.00 hr. 720.00 <br />Chip Spreader (1) 16 hrs @ $45.00 hr. 720.00 <br />Dump Trucks (4) 64 hrs @ $30.00 hr, 1.920.00 <br /> Total Equipment $ 4,720.00 <br /> Labor (In-Kind) <br />Maintainer Operator 16 hrs @ 15.91 $ 254.56 <br />Roller Operator 16 hrs@ 14.50 232.00 <br />Oil Truck Operator 16 hrs @ 14.50 232.00 <br />Oil Truck Operator 16hrs@14.50 232.00 <br />Chip Spreader Operator 16 hrs@ 14.50 232.00 <br />Truck Driver 64 hrs @ 14.50 928.00 <br /> Total Labor $ 2,110.56 <br /> <br />Project Application <br />Fonn 6b <br /> <br />Page of <br />