Laserfiche WebLink
<br />FORM 7f: Detailed Construction Expenses <br /> <br />All construction projects must be pre-approved by the A TCOG. If the specific details of the <br />construction costs are not known at this time, list the general details on this form. The: specific <br />details of the construction will then need to be proyided to and approved by the A TCOG before the <br />costs are incurred. <br /> <br />Types of Construction <br /> <br />Subcontracted <br />Yes/No Estimated Cost <br /> <br />810 tons of black base 2" overlay of <br />300' x 300' area <br /> <br />No $ 22.680.00 <br /> <br />6400 gallons CRS-2 emulsion oil for <br />seal coating <br /> <br />No <br /> <br />$ 4,295,00 <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />TOTAL <br />(Must equal Line 6 of the Overall Budget Summary) <br /> <br />-- ----- ---- <br />i <br />, <br /> <br />~-~--- .-- - - ~~-~ <br /> <br />$ 26,975.00 <br /> <br />The City of Paris will purchase the above <br />equipment; labor, land and other material <br />300' X 300' compost pad, <br /> <br />material and then will use our <br />to add 2" of overlay to our <br /> <br />Project Application <br />Form 7f <br /> <br />Page of <br />