My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-101-PRIMETIME AT THE RED BALL UNION STATION, STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM GRANT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1999
>
1999-101-PRIMETIME AT THE RED BALL UNION STATION, STATEWIDE TRANSPORTATION ENHANCEMENT PROGRAM GRANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:16 PM
Creation date
4/23/2001 7:49:34 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1999
Doc Type
Resolution
CITY CLERK - Date
8/5/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />x. ITEMIZED BUDGET <br /> <br />~ Quantity ~ Unit Price i Cost <br /> <br />Preliminary Engineering: <br />Work Activities: <br /> <br />Total Preliminary Engineering Costs <br /> <br />Environmental Costs: <br /> <br />Work Activities: <br /> <br />Total Environmental Costs <br /> <br />Real Property Costs: <br />Work Activities: <br /> <br />Total Real Property Costs <br /> <br />Construction Costs: <br />Work Activities: <br /> <br />Windows: Repair or replace 65 $1,054.00 $68,510 <br />Storefront: Repair or replace 1690 SQ, ft, 41.50 70,135 <br />Masonry: Clean 100%; replace; repaint 80% 8100 SQ. ft. 11.20 90,720 <br />Replace roof, connecting building I 5000 sq. ft. I 7.00 35,000 <br />Elevators 3 15,000.00 45,000 <br />Construction for elevator installation 3 10,000.00 30,000 <br />Mechanical; Electrical; Plumbing 16702 sq. ft. 25.00 417,550 <br />Interior Finish-out Floors 1-3 16,702 sq. ft. 55.00 918,610 <br />a. Visitor Center <br />b. Offices and Reception, I" floor <br />c. Red Ball HalVContinental Hall <br />d. New Construction for Kitchen <br />e. Kitchen equipment <br />f. New ADA Compliant restrooms <br />g. Activity Centers 2nd floor <br />h. Exercise Center wI Track 301 floor <br />Total Construction Costs 1,675,525 <br /> <br />TOTAL ITEMIZED BUDGET: $1.675,525 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.