Laserfiche WebLink
<br />Water,Tap Fees: <br /> <br />Contractor shall waive water tap fees associated with homes constructed in <br />Eastgate Subdivision. <br /> <br />Sewer Improvements: <br /> <br />Contractor shall install approximately two thousand five hundred linear feet (2,500 l.t.) <br />of six-inch (6") sewer pipe, seven (7) manholes, one (1) lift station, and outfall line. <br />Construction shall take place at the following locations: <br /> <br />Street <br /> <br />North Eastgate Court <br />Eastgate Court <br />Eastgate Place <br />South Eastgate Court <br />Back of lots 28-38 <br />Btwn lots 15 & 16 <br /> <br />Sewer Tap Fees: <br /> <br />From <br /> <br />47th Street <br />north cul-de-sac <br />North Eastgate Court <br />south cul-de-sac <br />North Eastgate Court <br />south cul-de-sac <br /> <br />To <br /> <br />north cul-de-sac <br />south cul-de-sac <br />South Eastgate Court <br />47'" Street <br />South Eastgate Court <br />Lift station <br /> <br />Contractor shall waive sewer tap fees associated with homes constructed in <br />Eastgate Subdivision. <br /> <br />Street Improvements: <br /> <br />Contractor shall install approximately sixty-three thousand square feet (63,000 <br />s.1.) of streets, three thousand cubic yards (3,000 c.y.) of grading, and eight hundred <br />linear feet (800 I.f.) of curb and gutter. Construction shall take place along the <br />following locations: <br /> <br />Street <br /> <br />North Eastgate Court <br />Eastgate Court <br />Eastgate Place <br />South Eastgate Court <br />471h Street R.O.W. <br /> <br />Flood and Drainage Improvements: <br /> <br />From <br /> <br />47th Street <br />north cul-de-sac <br />North Eastgate Court <br />south cul-de-sac <br />North Eastgate Court <br /> <br />To <br /> <br />north cul-de-sac <br />south cul-de-sac <br />South Eastgate Court <br />47th Street <br />South Eastgate Court <br /> <br />Contractor shall install approximately six hundred linear feet (600 I.f.) of <br />twelve-inch (12") reinforced concrete pipe, four (4) catch basins, and one (1) <br />headwall. Construction shall take place along the following locations: <br /> <br />Page 2 of 3 <br />