Laserfiche WebLink
<br />Tabular Summary of Project Elements and Costs <br /> <br />City of Paris, Heritage Park <br /> <br />I. Professional Services <br /> <br />A. <br /> <br />Site Planning <br /> <br />11. Land Acquisition (3.394 acres) <br /> <br />A. <br /> <br />3.394 acres by donation <br /> <br />Ill. Construction <br /> <br />F. <br /> <br />G. <br /> <br />H. <br /> <br />1. <br /> <br />J. <br /> <br />A. <br /> <br />Site Preparation <br /> <br />B. <br /> <br />Utilities <br /> <br />c. <br /> <br />Playground equipment, playground border <br />and surfacing; perimeter fencing <br /> <br />D. <br /> <br />Picnic tables and benches <br /> <br />E. <br /> <br />Picnic pavilion and slab; lighted and electrical <br /> <br />Walking track, Y, mile with concrete birm <br /> <br />Sidewalks <br /> <br />Sign <br /> <br />Engineering <br /> <br />Water Fountains <br /> <br />Total Project Cost <br />Matching Funds Requested <br /> <br />$ 2,000.00 <br /> <br />$ 62,200.00 <br /> <br />$ 4,000.00 <br /> <br />$ 2,000.00 <br /> <br />$ 67,250.00 <br /> <br />$ 12,450.00 <br /> <br />$ 29,000.00 <br /> <br />$ 32,000.00 <br /> <br />$ 6,500.00 <br /> <br />$ 1,500.00 <br /> <br />$ 2,000,00 <br /> <br />$ 3,500.00 <br /> <br />$ 224,400.00 <br />$ 112,200.00 <br />