My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-050-GATEWAY PROJECT AWARD BID TO HANSEN & ASSOCIATES
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1999
>
1999-050-GATEWAY PROJECT AWARD BID TO HANSEN & ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:05 PM
Creation date
1/24/2001 4:51:03 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1999
Doc Type
Resolution
CITY CLERK - Date
5/10/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />:! <br /> <br />,:1 <br />.', <br />.; <br /> <br />Ten Percent (10%) of Work Completed. <br /> <br />5.1.2 Upon Substantial Completion, in an amount sufficient to <br />increase total payments to CONTRACTOR to ninety-five percent (95%) <br />of the Contract Price, less such amounts as ENGINEER shall <br />determine, or OWNER maywithhold, in accordance with paragraph 14.7 <br />of the General Conditions. <br /> <br />5.2 Final Payment. Upon final completion and acceptance of the <br />Work in accordance with paragraph 14.13 of General Conditions, <br />OWNER shall pay the remainder of the Contract Price as recommended <br />by ENGINEER as provided in said paragraph 14.13. <br /> <br />Article 6. INTEREST <br /> <br />No interest will be paid to the CONTRACTOR on ret~ined money unless <br />required by law. <br /> <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br /> <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR <br />makes the following representations: <br /> <br />7.1 CONTRACTOR has familiarized itself with the nature and extent <br />of the Contract Documents, Work, site locality, and all local <br />conditions and Laws and Regulations that in any manner may affect <br />cost, progress, performance or furnishing of the Work. <br /> <br />7.2 CONTRACTOR has studied carefully all reports of explorations <br />and tests of subsurface conditions and drawings of physical <br />conditions which are identified in the Supplementary Conditions as <br />provided in paragraph 4.2 of the General Conditions, and accepts <br />the determination set forth in paragraph SC-4 .2 of the <br />Supplementary Conditions of the extent of the technical data <br />contained in such reports and drawings upon which CONTRACTOR is <br />entitled to reply. <br /> <br />7.3 CONTRACTOR has obtained and carefully studied (or ass u m e s <br />responsibility for obtaining and carefully studying) all such <br />examinations, investigations, explorations, tests, reports and <br />studies (in additions to or to supplement those referred to in <br />paragraph 7.2 above) which pertain to the subsurface or physical <br />conditions at or contiguous to the site or otherwise may affect the <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.