My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-014-PARADISE ESTATES PRO RATA WATER MAIN EXTENSION PROJECT, RES 99-004
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1999
>
1999-014-PARADISE ESTATES PRO RATA WATER MAIN EXTENSION PROJECT, RES 99-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:28 PM
Creation date
1/18/2001 10:05:38 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1999
Doc Type
Resolution
CITY CLERK - Date
2/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~, ".. <br /> <br />AGREEMENT <br /> <br />THIS AGREEMENT is dated as of the ~ day of February <br />19 99 by and between City of' Paris, Paris, Texas, <br />called OWNER) and William HeuberJ!;er Construction <br />called CONTRACTOR) . <br /> <br />in the year <br />(hereinafter <br />(hereinafter <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the <br />Contract Documents. The Work is.generally described as follows: <br />approximately 3475 L.F. 8" PVC, AWWA C-900, DR 18 waterrnain, 7185 <br />L.F. 6" PVC, AWWA C-900, DR18 waterrnain, 6 fire hydrant assemblies, <br />14 each long side customer services and 17 each short side customer <br />services with other appurtenant construction, complete in place. <br /> <br />The Project for which the Work under the Contract Documents may be <br />the whole or only a part is generally described as follows: <br />PARADISE ESTATES - PRO-RATA WATERMAIN EXTENSION. <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by City Engineer, City of Paris, <br />Paris, Texas, or his authorized representative, who is hereinafter <br />call ENGINEER and who is to act as OWNER'S representative, assume <br />all duties and responsibilities and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with <br />completion of the Work in accordance with the Contract Documents. <br /> <br />Article 3. CONTRACT TIME. <br /> <br />3.1 The Work will be substantially completed within 120 days <br />from the date when the Contract Time commences to run as provided <br />in paragraph 2.3 of the General Conditions, and completed and ready <br />for final payment in accordance with paragraph 14.13 of General <br />Conditions within 150 days from the date when the Contract Time <br />commences to run. <br /> <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time <br />is of the essence of this Agreement and that OWNER will suffer <br />financial loss if the Work is not completed within the times <br />specified in paragraph 3.1 above, plus any extensions thereof <br />allowed in accordance with Article 12 of the General Conditions. <br />They also recognize the delays, expense and difficulties involved <br />in proving in a legal or arbitration proceeding the actual loss <br />suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay <br /> <br />(but not as a penalty) CONTRACTOR shall pay OWNER One hundred <br /> <br />19 <br /> <br />t~HIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.