My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14 - 2013 BOND FUND-SOUTHEAST LIFT STATION CONSTRUCTION CONTRACT AWARD
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2017
>
07 - JULY
>
07/10/2017
>
14 - 2013 BOND FUND-SOUTHEAST LIFT STATION CONSTRUCTION CONTRACT AWARD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2017 8:24:44 AM
Creation date
7/6/2017 3:44:03 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 14 <br />memorandum <br />TO: Mayor & City Council <br />John Godwin, City Manager <br />FROM: Carla Easton, City Engineer <br />SUBJECT: 2013 BOND FUND - SOUTHEAST LIFT STATION CONSTRUCTION <br />CONTRACT AWARD <br />DATE: July 3, 2017 <br />BACKGROUND: The 2013 Bond Fund for Water and Sewer Improvements includes funding <br />for the Southeast Lift Station & Force Main Replacement Project, which consists of a complete <br />5.6 MGD lift station, approximately 4,000 feet of 18 -inch force main, 1,800 feet of access road <br />construction, and 900 feet of gravity main replacement. AECOM and Hayter Engineering <br />prepared the construction drawings and specifications. <br />STATUS OF ISSUE: On June 27, 2017, seven bids were received for the project and RBIS <br />submitted the apparent low bid in the amount of $ $2,393,937.85. The bids were reviewed and <br />references checked in accordance with the contract documents, and the engineer of record has <br />submitted a recommendation of contract award to RBIS. The contract documents require this <br />project to be completed within 270 calendar days after issuance of the notice to proceed. <br />Construction is anticipated to begin in late August. A summary of the bids received for this <br />project is as follows: <br />Bidder <br />Bid Amount <br />RBIS <br />$2,393,937.85 <br />Heritage Construction <br />$2,711,363.00 <br />HWH <br />$2,853,755.65 <br />Belt Construction <br />$2,940,764.50 <br />Pittard Construction <br />$2,950,000.00 <br />Red River Construction <br />$3,016,751.00 <br />Apeck Construction <br />$3,156,960.93 <br />BUDGET: Funding is available from 2013 Bond Fund for Water and Sewer Improvements. <br />RECOMMENDATION: Authorize the City Manager to execute a contract with RBIS <br />Construction Company, for construction of the Southeast Lift Station & Force Main <br />Replacement Project and related change orders for an amount not to exceed $2,500,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.