My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-066-WEST GALLON ELEVATED WATER STORAGE TANK PAINTING AGREEMENT, N. G. PAINTING INC
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1999
>
1999-066-WEST GALLON ELEVATED WATER STORAGE TANK PAINTING AGREEMENT, N. G. PAINTING INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:06 PM
Creation date
1/19/2001 5:11:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1999
Doc Type
Resolution
CITY CLERK - Date
6/14/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br /> <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br /> <br />7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br />Documents, Work, site locality, and all local conditions and Laws and Regulations that in <br />any manner may affect cost, progress, performance or furnishing of the Work. <br /> <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of <br />subsurface conditions and drawings of physical conditions which are identified in the <br />Supplementary Conditions as provided in paragraph 4.2 of the General Conditions, and <br />accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of <br />the extent of the technical data contained in such reports and drawings upon which <br />CONTRACTOR is entitled to reply. <br /> <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (in additions to or to supplement those referred to in paragraph 7 .2above) <br />which pertain to the subsurface or physical conditions at or contiguous to the site or <br />otherwise may affect the cost, progress, performance or furnishing of the Work at the <br />Contract Price, within the Contract Time and in accordance with the other terms and <br />conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 <br />ofthe General Conditions and no additional examinations, investigations, explorations, tests, <br />reports, studies or similar information or data are or will be required by CONTRACTOR for <br />such purposes. <br /> <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or <br />indicated on the Contract Documents with respect to existing Underground Facilities at or <br />contiguous to the site and assumes responsibility for the accurate location of said <br />Underground Facilities. No additional examinations, investigations, explorations, tests, <br />reports, studies or similar information or data in respect of said Underground Facilities are <br />or will be required by CONTRACTOR in order to perform and furnish the Work at the <br />Contract Price, within the Contract Time and in accordance with the other terms and <br />conditions of Contract Documents, including specifically the provisions of paragraph 4.3 of <br />the General Conditions. <br /> <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br /> <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br />discrepancies that he has discovered in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.