Laserfiche WebLink
<br />~ <br /> <br />C 1999-00 Budget Notes <br />.ge 3 <br /> <br />, . <br /> <br />Train ride operation expenses no longer exist. <br /> <br />-", <br /> <br />'. Tour de Paris expenses are set off by registration fees and donations. <br />TOTAL. . . . . . . . . . . . ..l 7,789 <br /> <br />Mailing and telephone costs. BOO-number tolis' average $115 monthly. <br />TOTAL,~.............~ 6.000 <br /> <br />I. printing and supplies to include stationary, envelopes, "Happenings In <br />Paris Calendar." <br /> <br />TOTAL..............! 2.000 <br /> <br />I. Anticipated costs for equipment/furnishing purchases after move into <br />depot. <br /> <br />TOTAL... . . ... . .....~ 3.500 <br /> <br />). Audit required by city contract. <br /> <br />TOTAL. . . . . . . . . . . . . . ~ <br /> <br />600 <br /> <br />1. No estimated bank service charges projected. <br /> <br />2. Assistance with long term building maintenance above that which is <br />included in the overhead; i.e., parking lot repair, entry way repair, <br />termite extermination. This does not represent 1/3 of the estimated cost <br />of repairs although the City holds title to 1/3 of the building. <br />TOTAL....... . . .. . ... ..~ 1.000 <br /> <br />3. The Administrative Reserve would be available in the event of unexpected <br />administrative needs. <br /> <br />TOTAL..............ll.OOO <br /> <br />4. Cost for the printing of the visitors and Newcomers Guide to Paris. It <br />is offset by the ad revenue generated. <br /> <br />TOTAL.............~ 18.000 <br /> <br />5. In accordance with the Contract with the City of Paris, 3/7th of the <br />motel tax collections received from the City is transferred into the <br />operating budget of the Love Civic Center. That budget is approved by <br />the Governing Board of the Love Civic Center, Chamber Board of Directors <br />and the City of Paris. <br /> <br />TOTAL............ .$107.143 <br /> <br />'6. Tourism Workshop expenses no longer exist. This was a one time revenue <br />generator. <br /> <br />'7. Depot Expenses are incurred through utility useage during the <br />:onstruction phase. <br /> <br />TOTAL. .. .. . . . . . . . . . . S <br /> <br />2.500 <br /> <br />, . <br /> <br />~__'< ....'..;.;,i' "_';".;',; ~,';.'.~,:-~.- <br />:-;L~.~~Ej{{t~lt~;\~S~~~;:-~~@ft;::lM~~~1-f:-::'.-:.' <br />