Laserfiche WebLink
<br />RESOLUTION NO. 2000-180 <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, <br />PARIS, TEXAS, AUTHORIZING THE CITY MANGER TO NEGOTIATE <br />AND EXECUTE A CONTRACT FOR PRELIMINARY ENGINEERING <br />SERVICES, SURVEY SERVICES, COST ESTIMATES, AND <br />ENGINEERING STUDIES WITH HAYTER ENGINEERING FOR <br />SERVICES RELATED TO THE WADE PARK, 24TH STREET S.E., AND <br />LAMAR A VENUE DRAINAGE PROJECT; MAKING OTHER FINDINGS <br />AND PROVISIONS RELATED TO THE SUBJECT; AND PROVIDING AN <br />EFFECTIVE DATE. <br /> <br />WHEREAS, the Drainage Committee of the City of Paris has identified and prioritized <br />drainage projects for construction and implementation by the City of Paris; and, <br /> <br />WHEREAS, one project acknowledged as being of the highest priority is construction of <br />necessary drainage control and mitigation structures to address current drainage problems associated <br />with and adjacent to Wade Park, 24th Street S.E., and Lamar Avenue; and, <br /> <br />WHEREAS, in order to identify the most appropriate drainage control methodology in <br />addressing the problems unique to this area, the City Council finds and determines that a preliminary <br />design study, including preliminary design services, survey work, engineering studies and soil <br />samplings, cost analyses of alternative drainage control approaches, and other similar services are <br />necessary before actual design and construction of drainage control structures can begin; NOW, <br />THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, <br />TEXAS: <br /> <br />Section 1. That the findings set out in the preamble to this resolution are hereby in all things <br />approved. <br /> <br />Section 2. That the City Manager be, and he is hereby authorized, in conjunction with the <br />City Attorney, to negotiate and execute an engineering services contract with Hayter engineering for <br />preliminary design services, cost estimate services, survey, engineering studies, soil testing services, <br />and other similar services as shall be necessary incident to identifying the various optional <br />approaches to drainage control for those drainage problems identified on property adjacent to Wade <br />Park. <br /> <br />Section 3. That this resolution shall be effective from and after its date of passage. <br />