Laserfiche WebLink
<br />DETAILED BUDGET SHEET 6: Grant-Funded Construction <br /> <br />This budget sheet should be completed if any expenses are entered for construction on Line 6 <br />of your Grant Budget Summary, <br /> <br />Expenses budgeted under this category should be for costs related to the enhancement or <br />building of permanent facilities, No construction costs shall be incurred by a pass-through <br />grant recipient unless the construction details are approved in advance by the ATCOG. <br />Appropriate costs that may be included are: <br /> <br />a, The cost of planning the project; <br />b. The cost of materials and labor connected to the construction project; <br />c, The cost of equipment attached to the permanent structure; and <br />d. Any subcontracts, including contracts for services, performed as part of the <br />construction, <br /> <br />In the space below. please describe the construction expenses associated with the proposed <br />project, providing as many specifications as possible at this time (please identify any services <br />to be subcontracted): <br /> <br />Not Applicable. <br /> <br />32 <br />