My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-102-RES AWARDING THE BID AND AUTHORIZING THE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2000
>
2000-102-RES AWARDING THE BID AND AUTHORIZING THE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:42 PM
Creation date
7/23/2001 6:48:17 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2000
Doc Type
Resolution
CITY CLERK - Date
7/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TOTAL OF ALL UNIT PRICES BID <br /> <br />$ <br /> <br />(dollars) <br />SUBJECT TO ACTUAL QUANTITIES CONSTRUCTED, <br /> <br />( use words) <br /> <br />As provided in paragraph 11.03 of the General Conditions, estimated quanlities a,e not guaranteed, and <br />determinalions of actual quantities and classifications are to be made by ENGINEER as p,ovided in paragraph 9.08 of the <br />General Conditions, Unit prices have been computed as p,ovided in pa,agraph 11.03 of the General Condilions, <br /> <br />(X )Yes or ( )No <br />C. For all Work, at lhe prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br /> <br />ARTICLE 6 - PAYMENT PROCEDURES <br /> <br />6.01 Submittal and Processing of Payments <br /> <br />A. CONTRACTOR shall submit Applieations for Payment in aeeordance with Article 14 of the General <br />Conditions. Applieations for Payment will be processed by ENGINEER as provided in lhe General Condilions. <br /> <br />6,02 Progress Payments; Retoinage <br /> <br />A. OWNER shall make progress pa}ments on aceount oflhe Contraet Priee on the basis of CONTRACTOR's <br />Applications for Payment on or about the 15 day of each month during performance oflhe Work as provided in <br />paragraphs 6.02.A.I and 6.02.A.2 below. All such payments will be measured by lhe schedule of values established in <br />paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units eompleted) <br />or, in the event tbe,e is no sehedule of values, as provided in the General Requirements: <br /> <br />1. Prior 10 Substantial Complelion. progress payments will be made in an amount equal 10 lhe pereentage <br />indicated below but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER <br />m'l:;" determine or OWNER may withhold, in accordance with paragraph 14.02 of the Gene,al Conditions: <br /> <br />a. 90 % of Work eompleted (with the balanee being retainage). Iflhe Work has been 50% <br />eompleted as delennined by ENGINEER. and if the eharacter and progress of the Work have been satisfaetory to OWNER <br />and ENGINEER. OWNER. on recommendation of ENGINEER. may determine that as long as the charaete, and progress <br />of the Work remain satisfaetory 10 them, lhere will be no retainage on aceount ofWo,k subsequently eompleted, in whieh <br />ease lhe remaining p,ogress payments prior 10 Substantial Completion will be in an amount equal to 100% of the Work <br />completed less the aggregate of payments p,eviously made; and <br /> <br />being retainage). <br /> <br />b. 90 % ofeost of materials and equipment nol ineorporated in lhe Work (with the balanee <br /> <br />2, Upon Substantial Completion, OWNER shall pay an amount suffieient to increase total payments 10 <br />CONTRACTOR to 95 % of the Work eompleted, less such amounts as ENGINEER shall determine in aeeordanee <br />with paragraph 14.02.B.5 of the General Conditions and less 100 % of ENGINEER's estimate of the value of Work to <br />be eompleted or eorrecled as shown on the tentative Iisl of items to be completed or eorreeted attaehed to the eertifieate of <br />Substantial Completion. <br /> <br />6.03 Final Payment <br /> <br />A. Upon final completion and acceptance of the Work in aecordance with paragraph 14,07 of the General <br />Conditions, OWNER shall pay lhe remainde, of the Contraet Price as ,eeommended by ENGINEER as provided in said <br />paragraph 14.07. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.