Laserfiche WebLink
<br />ARTICLE 7 - INTEREST <br /> <br />7.01 All moneys not paid when due as provided in Article 14 oflhe General Conditions shall bear interesl at the rate of <br />8 .% per annum. <br /> <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br /> <br />8.0 I In order to induce OWNER to enter inlo this Agreement CONTRACTOR makes the following representations: <br /> <br />A. CONTRACTOR has examined and ea,efully studied the Contraet Doeuments and the other relaled data <br />identified in lhe Bidding Documents. <br /> <br />B. CONTRACTOR has visited the Sile and become familiar wilh and is satisfied as 10 lhe general, local, and Site <br />eonditions thai may affeel eost, progress, and performance of lhe Work. <br /> <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and Jocal Laws and Regulations that <br />may affect cost, progress, and performance of the Work. <br /> <br />D. CONTRACTOR has carefully studied all: (I) (X)Yes or ( )No - reports of explorations and tests of <br />subsurfaee conditions at or eonliguous to the Site and all drawings of physical eonditions in or relaling to existing surface or <br />subsurface structures al or eontiguous to the Sile (exeepl Underground Faeilities) which have been identified in the <br />Supplementary Conditions as provided in paragraph 4.02 oflhe General Conditions and (2) (X )Yes or ( )No - reports <br />and drawings of a Hazardous Environmental Condition, if any, at the Site whieh has been identified in the Supplementary <br />Conditions as provided in paragraph 4,06 of the General Conditions, <br /> <br />E, CONTRACTOR has obtained and earefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, invesligalions, explo,ations, lests, studies, and data eoncerning eonditions <br />(sw;faee, subsurfaee, and Underground Faeilities) at or eontiguous to the Site which may affeet eost. progress. or <br />perfonnance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of <br />eonstruction to be employed by CONTRACTOR, including applying the specifie means, methods, teehniques, sequences, <br />and procedures of construction, if any, expressly required by the Contract Documents 10 be employed by CONTRACTOR, <br />and safely p,ecautions and programs incident thereto. <br /> <br />= <br /> <br />F, CONTRACTOR does not eonsider that any further examinalions, investigalions, explorations, lesls, studies, or <br />data are neeessary for lhe performance oflhe Work at the Contrael Price, within the Contract Times, and in aceordanee <br />with the other terms and conditions of the Contract Documents. <br /> <br />G. CONTRACTOR is aware of the general nature of work 10 be performed by OWNER and the others at the Site <br />lhal relates 10 the Work as indieated in lhe Contract Documents, <br /> <br />H. CONTRACTOR has eorrelaled the informalion known to CONTRACTOR, information and observations <br />obtained from visits to the Site. reports and drawings idenlified in lhe Cont,act Documents, and all additional examinations. <br />investigations, explorations, tests, studies, and data with the Contract Documents. <br /> <br />l. CONTRACTOR has given ENGINEER written notice of all eonfliets, errors, ambiguities, of discrepancies that <br />CONTRACTOR has discovered in the Contract Documents, and the written resolution lhereofby ENGINEER is aeeeptable <br />10 CONTRACTOR.. <br /> <br />J. The Contract Doeuments are generally sufficient [0 indieate and convey unde,standing of all terms and <br />eondilions for performanee and furnishing oflhe Work. <br /> <br />4 <br />