My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-116-RES APPROVING CHANGE ORDER NO. ONE TO THE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2000
>
2000-116-RES APPROVING CHANGE ORDER NO. ONE TO THE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:45 PM
Creation date
7/23/2001 7:33:45 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2000
Doc Type
Resolution
CITY CLERK - Date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SAM A. JUZBEE · ARCHITECTURAL Sb,- VICES <br />Construction Design, Planning. Inspection, & Consultation <br />Licensed in Texas & Arkansas; Professional Member CS[ & SBCCI <br />P.O. Box 667 Paris. Texas 75461 (903) 925-2485 <br /> <br />Change Order: SKINNER # 1 <br />Dated: August 7, 2000 <br /> <br />CHANGE ORDER <br />Skinner # , <br /> <br />PROJECT NAME: Fire Stations #2 & #4 <br />City of Paris <br /> <br />Paris, Texas <br /> <br />To Contractor: Skinner Concrete Construction <br /> <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br /> <br />In order to conform to the anchor bolt setting plan submitted by Hanison, Walker & Harper for the metal structure, the <br />following changes are required. <br /> <br />For Fire Station #2 <br />1. Move Footing at Grids D-3 to Grids D-2. Add cross beams C-2 to D-2 and C-6 to D-6. <br />2. Ail steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br />3. Change Footings at Grids B-6 and C-6 to be same as at Grids B:2 and C-2. <br />4. Cast column Pedestals integral with the floor slab. Assure anchor bolts have a minimum 12" embedment. <br /> <br />For Fire Station #4 <br />1. Reduce size of Drilled Piers at Grids D-3 and D-5 to 18"/36". <br />2. Add new Drilled Pier at Grids D-2. Size shall be 24"/48". <br /> <br />3. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br /> <br />4. At your option column Pedestals may be cast integral with the floor slab. Assure anchor bolts have a <br />minimum 12 embedment. <br /> <br />The Contract Sum will be increased by this Change Order in the amount .................. $ 290.00 <br />The Contract time will not be increased by this Change Order................................ ( no ) days. <br />The date of Substantial Completion as of the date of this Change Order, therefore is: unchaneed. <br /> <br /> <br />['I(;/)/I(/" {P"cr..k <br />YoYffler Cclot heA G'toQ~ <br />Byl2k-r~ <br />Date <; - q - 'LOOO <br /> <br /><':SRlfoetor,:> "''''e.<!. <br /> <br />By <br />Date <br /> <br />EXHIBIT <br /> <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.