Laserfiche WebLink
<br />SAM A. ....UZBEE . ARCHITECTURAL SE._ /ICES <br /> <br />Construction Design. Planning. Inspection. & Consultation <br />Licensed in Texas & Arkansas; Professional Member CSI & SBCCI <br />P.O. Box 667 Paris. Texas 75461 (903) 925-2485 <br /> <br />CHANGE ORDER <br /> <br />Harrison Walker Harper # 1-2 <br />Change Order: HARRISON , WALKER & HARPER # I for Station # 2. <br />Dated: August 7, 2000 <br /> <br />PROJECT NAME: Fire Station #2 <br />City of Paris <br />Paris, Texas <br /> <br />To Contractor: Harrison, Walker & Harper, LP. <br /> <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br /> <br />1. Eliminate column at Grids 0-5. <br />2. Move column location from Grids 0-3 to Grids 0-2. <br /> <br />3. Eliminate steel tube columns along Grid Line 1. Cantilever roof framing from Grid Line 2 to cover the Front <br />Porch. <br /> <br />4. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br /> <br />5. Eliminate Portal Frame and "X" bracing at Grids C-4 to 0-4 and at Grids C-6 to 0-6. <br />Add Portal Frame at Grids B-6 to C-6. <br /> <br />6. 2411 wide "Ceram-A-Star 950" roofing panels may be used in lieu of 1811 wide panels. <br /> <br /> <br />7. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br /> <br /> <br />8. Assure anchor bolts have a minimum 12" embedment length. <br /> <br />The Contract Sum will be decreased by this Change Order in the amount .................. < $ 1,900.00 > <br />The Contract time will not be Increased by this Change Order ..................................( no) days. <br />The date of Substantial Completion as of the date of tbis Change Order, therefore is: unchanged. <br /> <br />This Change Order must be signed by both the Contractor and the Owner before it becomes effective. <br /> <br /> <br />Harrison, Walker & Harper, LP <br /> <br />~:nt^o~~ <br /> <br />Date C_ <br /> <br />Owner <br /> <br />By <br />Date <br /> <br />EXHIBIT A <br />