My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-118-RES APPROVING CHANGE ORDER NO. ONE TO THE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2000
>
2000-118-RES APPROVING CHANGE ORDER NO. ONE TO THE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:45 PM
Creation date
7/23/2001 7:36:15 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2000
Doc Type
Resolution
CITY CLERK - Date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
View images
View plain text
<br />SAM A. jUZBEE. ARCHITECTURAL Sb<VICES <br />Construction Design. Planning. Inspection. & Consultation <br />Licensed in Texas & Arkansas; Professional Member CSI & SBCCI <br />P.O. Box 667 Pans. Texas 7546t (903) 925-2485 <br /> <br />CHANGE ORDER <br /> <br />Harrison Walker Harper # 1-4 <br />Change Order: HARRISON, WALKER & HARPER # 1 for Station # 4. <br />Dated: August 7, 2000 <br /> <br />PROJECT NAME: Fire Station #4 <br />Citr of Paris <br />Pans, Texas <br /> <br />To Contractor: Harrison, Walker & Harper, LP. <br /> <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br /> <br />1. Eliminate column at Grids 0-5. <br />2. Move column location from Grids 0-3 to Grids 0-2. <br />3. Eliminate steel tube columns along Grid Line 1. Cantilever roof framing from Grid Line 2 to cover the Front <br />Porch. <br /> <br />4. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br /> <br />5. Eliminate Portal Frame and "X" bracing at Grids C-4 to 0-4 and at Grids C-6 to 0-6. <br />Add Portal Frame at Grids B-6 to C-6. <br /> <br />6. 24" wide "Ceram-A-Star 950" roofing panels may be used in lieu of 18" wide panels. <br /> <br />7. All steel columns shall have a base bearing Elevation at Finish Floor Line 100'- 0". <br /> <br />8. Assure anchor bolts have a minimum 12" embedment length. <br /> <br />The Contract Sum will be decreased by this Change Order in the amount .................. < $ 1,900.00 > <br />The Contract time will not be Increased by this Change Order.................................. ( no ) days. <br />The date of Substantial Completion as of the date of this Change Order, therefore is: unchanged. <br /> <br /> <br />Harrison, Walker & Harper, LP <br /> <br />:-"- .~ <br />Date^( --t- <br /> <br />Uwner <br /> <br />By <br /> <br />Date <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).