Laserfiche WebLink
Exceptions: <br />Upsizing of Generator to Accommodate for 3rd Pump is not included in this pricing. <br />This price is only good for 30 days, due to equipment prices possibly increasing. <br />(If a decision is made to proceed with this option for pump # 3 after the 30 days, we will reevaluate the pricing from <br />the equipment suppliers and pass on any changes if needed.) <br />Payment to be made as follows: <br />Due upon completion. <br />All material is guaranteed to be as specified. All work is to be completed in a workmanlike manner, according to standard practices. Any <br />alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge <br />over and above the estimate. All agreements are contingent upon strikes, accidents, or delays beyond our control. Owner is to carry fire, tornado, <br />and other necessary insurance. <br />Note: We reserve the right to withdraw this proposal if not accepted within 30 calendar days. <br />RBIS, LLC., Authorized Signature <br />Acceptance of Proposal: The above process, specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do the work as specified. Payment will be made as outlined above. <br />Signature: Date of Acceptance: <br />