My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996
City-of-Paris
>
Boards and Commissions
>
AIRPORT ADVISORY BOARD
>
1972-2016
>
1990-1999
>
1996
>
1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 3:36:00 PM
Creation date
11/30/2017 3:36:00 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Bill Boothe <br />1. Pilot Training <br />2. Maintenance Airframe <br />3. Maintenance Power Plant <br />4. Aircraft Rental <br />D. Knox Flying Service <br />1. Agricultural Operations <br />A motion- was made by Vic Ressler and seconded by Tony Daigle to <br />recommend approval of all permits applied for. The motion passed 5 -0. <br />4. Review annual FAA Inspection <br />The annual inspection was completed on July 30 -31, 1996. The City of <br />Paris corrected the deficiencies listed by the inspection by the correction <br />dates. All recommendations that were made by the FAA inspector have <br />been completed. The major discrepancy was the need for restriping the <br />primary runway by October 31, 1996. This project was completed at a <br />cost of $14,943.75 with the City of Paris paying 1/2 and the Texas <br />Department of Transportation providing the other 1/2 of the cost. This <br />was the first time grant funds were available for airport maintenance <br />projects. <br />5. Discuss status of 1996 -97 Airport Improvement Project: <br />This item was discussed in agenda item #7. <br />6. Discuss status of 1997-98-Airport Improvement Project: <br />During the past two weeks, City Staff has been reviewing proposals from <br />28 firms interested in this project. The list has been shortened to three <br />firms. These three firms will prepare formal proposals for the Selection <br />Committee to review the week of December 16, 1996. A final decision- on <br />the consultant will be released by December 23, 1996. <br />7. Review of terminal design with Architect: <br />Reeves Hayter reviewed the taxiway reconstruction part of the project. <br />The Board discussed with Mr. Hayter what was involved in the project and <br />also discussed what options were available for resurfacing areas next to <br />three hanger areas. <br />David Denny, Architect, reviewed the plans for the new terminal building. <br />After review of the plans by the Board, three recommendations were <br />
The URL can be used to link to this page
Your browser does not support the video tag.