Laserfiche WebLink
Page 2 <br />4. 1998/1999 Airport Improvement Project. <br />Reeves Hayter presented plans for improving hangar area access taxiway; <br />north 750' and south 750' of Runway 17 -35 to be reconstructed to bear 75,000 <br />lbs. gross weight; remaining 4,500' runway is to have damaged areas cut out <br />and new concrete poured and overlaid with 2" thick slurry sealed; Taxiway B <br />is going to be closed and sealed; Taxiway A is to have damaged concrete <br />replaced and sealed; Apron Area is to have bad spots cut out and replaced. <br />Plans have been sent to the Texas Department of Transportation for approval. <br />Upon approval, bids will be solicited. <br />5. New Business: <br />A. The Board recommends at least eight (8) additional tie -down slots be <br />installed before work starts on the taxiway. <br />B. Grounding rods should be installed between tie -down slots for <br />improved safety with refueling operations. <br />6. The Board members toured the new terminal and discussed the color scheme. <br />7. The meeting was adjourned at 6:55 P.M. <br />or er: J.W. Ashmore <br />