Laserfiche WebLink
<br />responsibilily on ENGINEER to make any examination to ascertain how or for what purposes <br />CONTRACTOR has used the monies paid on account of the contract price, or to determine that title <br />to any of the work, materials or equipment has passed to OWNER free and clear of any lien, claims, <br />security interesls or encumbrances, or lhat there may not be olher matters at issue between OWNER <br />and CONTRACTOR that might affect the amount that should be paid. <br /> <br />2.5.8 Jnsrp~ti()ns <br /> <br />ENGINEER shall conduct an inspection to determine if the work is substantially complete. and a tinal <br />inspection to determine if the completed work is acceptable, so that ENGINEER may recommend final <br />payment to CONTRACTOR. Any such recommendation is subject 10 the limitations expressed earlie, <br />herein <br /> <br />2 5.9 T imit::ttinn of R p.~r()n",ihilitip", <br /> <br />ENGINEER shall not be responsible for the acts or omIssIons of any CONTRACTOR, or its <br />subcontractor, supplier, or any of the CONTRACTOR'S or subcontraclor's suppliers, agents or <br />employees, or any other persons (except ENGINEER'S own employees and agents) at the site or <br />otherwise furnishing or performing any of the CONTRACTOR'S work; however, nothing contained in <br />this section shall release ENGINEER from liability for failure to properly perform duties and <br />responsibilities assumed by ENGINEER in the contract documents. <br /> <br />SFrTlON 7 11 _ AOmTlONAJ FNGTNFFRING SFRVTlFS <br /> <br />The following "additional services" are known to be required at the time of this agreement. and are <br />authorized at per diem rates shown as Exhibit A These and other "additional services" which may be <br />added as required will be paid for as additional services in accord with Section 3b. <br /> <br />2.6. I Crossing Pennils - ENGINEER will assist OWNER in obtaining permils required for <br />construction on railroad or highway right-of-way, including preparation of necessary forms, and <br />liaison with TxDOT. OWNER will pay any permit fees levied. <br /> <br />2.6.2 Record Drawings - ENGINEER will compile for client a set of record drawings, showing data <br />furnished to the ENGINEER by CONTRACTOR or OWNER, and provide two sets of prinls <br />(and one reproducible copy). <br /> <br />2.63 Other Permits - ENGINEER will assist in preparing documentation for environmental or <br />construction permits, such as 404 permits or other statelfederal permits, as requested by <br />OWNER. <br /> <br />26.4 Easement and Boundary Surveys - ENGINEER will provide, if requested, a registered land <br />surveyor and support personnel to prepare field notes and plats and stake proposed or existing <br />easements or fee-simple acquisitions, <br /> <br />2.6.5 Construction Materials Testing - Quality assurance testing of soil compaction, concrete and <br />similar materials as construction progresses. <br /> <br />2.6.6 Extended or numerous meetings beyond those normally encountered in a project of this nature. <br /> <br />9 of 10 <br />