Laserfiche WebLink
Mr. Shawn Napier <br />August 9, 2012 <br />Page 3 of 3 <br />engineer licensed in the State of Texas, Temporary bracing may be used, but a permanent <br />repair is required. <br />4) If temporary bracing has been installed and approved the structural engineer, we recommend <br />that the fourth floor and parapet walls be monitored regularly until a permanent repair has <br />been completed, <br />5) The masonry in the parapet walls should be examined and all loose bricks,. The loose brick <br />should be re -installed with new mortar. <br />T WTr, I IT I rMIT-4t r t w, l!!!! t s M. UrL arC7 0 servations as par) <br />of our service. Dietz Engineers, LLC has ascertained to the best of curability the visually <br />apparent structural defects. However, as field observations were conducted in a building in <br />which some: portion of the structural framing were concealed by building finishes, Dietz <br />Engineers, LLC cannot be responsible for failing to a,scertain structural deficiencies which were <br />not visible due to existing conditions in, the buildo warranty, either expressed or implied, <br />mgarding the condition of the building structure is intended. <br />Sincerely, <br />Dietz Engineers, LLC <br />President <br />MWAEL F-- BWH <br />t ...... *114-1 .............. <br />111 0 *0 1 0 <br />