My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-129-RES APPROVING/AUTHORIZING EXECUTION OF AGREEMENT FOR PROFESSIONAL SERVICES WITH HAYTER ENG
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2001
>
2001-129-RES APPROVING/AUTHORIZING EXECUTION OF AGREEMENT FOR PROFESSIONAL SERVICES WITH HAYTER ENG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:16 PM
Creation date
10/30/2001 6:36:20 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2001
Doc Type
Resolution
CITY CLERK - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />to any of the work, materials or equipment has passed to OWNER free and clear of any lien, claims, <br />security interests or encumbrances, or that there may not be other matters at issue between OWNER <br />and CONTRACTOR that might affect the amount that should be paid. <br /> <br />2.5.8 Tn"pp.~tion" <br /> <br />ENGINEER shall conduct an inspection to determine if the work is substantially complete, and a final <br />inspection to determine if the completed work is acceptable, so that ENGINEER may recommend final <br />payment to CONTRACTOR. Any such recommendation is subject to the limitations expressed earlier <br />herein. <br /> <br />2.5.9 T imitMion ofRp."pon"ihilitip." <br /> <br />ENGINEER shall not be responsible for the acts or omISSions of any CONTRACTOR, or its <br />subcontractor, supplier, or any of the CONTRACTOR'S or subcontractor's suppliers, agents or <br />employees, or any other persons (except ENGINEER'S own employees and agents) at the site or <br />otherwise furnishing or performing any of the CONTRACTOR'S work; however, nothing contained in <br />this section shall release ENGINEER from liability for failure to properly perform duties and <br />responsibilities assumed by ENGINEER in the contract documents. <br /> <br />SFf:TION? I'i - ADDTTIONAl. FNGlNFFRTNCT SFRVTf:FS <br /> <br />The following "additional services" are known to be required at the time of this agreement, and are <br />authorized at per diem rates shown as Exhibit A. These and other "additional services" which may be <br />added as required will be paid for as additional services in accord with Section 3b. <br /> <br />2.6.1 Crossing Permits - ENGINEER will assist OWNER in obtaining permits required for <br />construction on highway right-of-way, including preparation of necessary forms, and liaison <br />with TxDOT. OWNER will pay any permit fees levied. <br /> <br />2.6.2 Record Drawings - ENGINEER will compile for client a set of record drawings, showing data <br />furnished to the ENGINEER by CONTRACTOR or OWNER, and provide two sets of prints <br />(and one reproducible copy). <br /> <br />2.6.3 Other Permits - ENGINEER will assist in preparing documentation for environmental or <br />construction permits, such as 404 permits or other state/federal permits, as requested by <br />OWNER. <br /> <br />2.6.4 Easement and Boundary Surveys - ENGINEER will provide, if requested, a registered land <br />surveyor and support personnel to prepare field notes and plats and stake proposed or existing <br />easements or fee-simple acquisitions. <br /> <br />2.6.5 Construction Materials Testing - Quality assurance testing of soil compaction, concrete and <br />similar materials as construction progresses. <br /> <br />2.6.6 Extended or numerous meetings beyond those normally encountered in a project of this nature, <br />including public hearings, utility negotiations, assistance in negotiating right-of-way, <br />condemnation or other legal proceedings, or similar. <br /> <br />9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.