Laserfiche WebLink
2018-2019 Materials Bid Tabulation <br />Item <br />Richard Drake <br />Ergon Asphalt <br />Frogman Sand <br />SCS Materials <br />Serendipity Logistics <br />Reggie Horton <br />Tim MacDonald <br />& Gravel <br />Steve Cope <br />LeAnn Watson <br />6290 Hwy 271 N <br />11612 RM 2244 <br />Luke Krogman <br />5020 SE Loop 286 <br />2245 FM 1503 <br />Powderly TX 75473 <br />Building 1', Ste 250 <br />POB 1336 <br />Paris TX 75460 <br />Deport TX 75435 <br />903.732.4781 <br />Austin TX 78738 <br />Pairs TX 75461 <br />901249.3530 <br />903.491.1272 <br />512.469.9292 <br />901784.8627 <br />Aggregate Cover <br />Stone Type B Grade <br />$32.40 <br />NO BID <br />NO BID <br />$32.56 <br />NO BID <br />4 Uncoated <br />Aggregate Cover <br />Stone Type B Grade <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />5 Coated <br />Aggregate Cover <br />Stone Type B Grade <br />$33.40 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />5 Uncoated <br />Aggregate Cover <br />Stone Type B <br />NO BID <br />NO BID, <br />Na BID <br />$30.56 <br />NO BID <br />Modified Grade 5 <br />Uncoated <br />CRS -2 Emulsion <br />NO BID <br />$1.9800 <br />NO BID <br />Na BID <br />NO BID <br />Asphalt <br />HMAC (Hot Mix <br />$74.80 <br />NO BID <br />NO BID <br />$64.00 <br />NO BID <br />Asphalt Concrete) <br />Hot Mix Cold Laid <br />$70.90, <br />NO BID <br />NO BID <br />$65.00 <br />NO BID <br />Asphalt Type A <br />Hot Mix Cold Laid <br />$66.30 <br />NO BID <br />NO BID <br />$65.00 <br />NO BID <br />Asphalt Type B <br />Hot Mix Cold Laid' <br />$69.60 <br />NO BID <br />NO BID <br />$67.75 <br />NO BID <br />, Asphalt Type D <br />Portland Cement <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Concrete 5 Sack <br />Portland Cement <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Concrete 6 Sack <br />Portland Cement <br />Concrete Grout 5 <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />NO BID <br />Sack <br />Portland Cement <br />Concrete Grout 6 <br />NO BID <br />NO BID <br />NO, BID <br />NO BID <br />NO BID <br />Sack <br />Flexible Base (Red <br />$16.25 <br />NO BID <br />$15 .10 —7 <br />$15-81 <br />$16.22 <br />Rock) <br />I <br />SS -1 Emulsion <br />NO BID <br />$1,9800 <br />Na BID <br />NO BID <br />NO BID, <br />Asphalt (Tack Oil) <br />Sand - per yard <br />$9.90 <br />NO BID <br />$10.50 <br />NO BID <br />$12.48 <br />Top Soil - per yard $11.00 NO BID $10.50 NO BID $11.30 <br />Flexible Base (White NO BID NO BID $15.25 NO BID $19.56 <br />Rock) <br />Ergon - Federal Environmental) Fee will be added to above prices at a rate of $.49770/ton for asphalt and polymer loads, or $,00150/gal for <br />emulsion loads. Bid is for full transport loads of 5,500 gallons. Freight is based on a full transport load, even if a full load of material is, not <br />ordered. The common carrier bills demurrage at $80 per hr. after the second hr. Return freight is 1/2 of the outgoing tariff. Pump and <br />hose charge is $90 per load. <br />