My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-147-RES APPROVING CHANGE ORDER NO 1 TOTHE CONTRACT WITH RICHARD DRAKE CONSTRUCTIONFOR PREPARATION OF SITE WORK
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2001
>
2001-147-RES APPROVING CHANGE ORDER NO 1 TOTHE CONTRACT WITH RICHARD DRAKE CONSTRUCTIONFOR PREPARATION OF SITE WORK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:29:17 PM
Creation date
10/30/2001 7:27:21 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2001
Doc Type
Resolution
CITY CLERK - Date
9/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_.c:r.=-a~l~.~~. <br /> <br />'1I[_II...III'I.""'D'~.... ~~,:-.'I~..n.. <br /> <br />..I..'].:l')~I""')~I~I:t: <br /> <br />... <br /> <br />.08/30/01 14:08 FAX <br /> <br />BWR - TYler <br /> <br />~001 <br /> <br />....... BUCHER, WilLIS & RATLIFF <br />..,.,.~ CORPORATION <br /> <br />To: Tommy Havnes <br />City of Paris <br /> <br />From: <br /> <br />FACSIMILE <br /> <br />Frank Davis ~~ <br /> <br />Telephone: <br />FAX # <br /> <br />903-785-7511 <br />903-784-1798 <br /> <br />Title: <br /> <br />BWR Project No. <br /> <br />Number of Pages <br />including Cover Page: 3 <br /> <br />Date: <br /> <br />Auaust30.2001 <br /> <br />Re: Airport Site Preparation - Change Order No.1 <br /> <br />Notes: <br /> <br />Attached Are the change order forms for the site preparation around the new T-Hangars. The <br />Change Order Detail shows the Water Line adjustment, but you will need to verify the amount <br />shown for this item. Janice and Steve Hodges will need to prepare the final change order forms <br />that you use and present tot he Council. <br /> <br />The original quantity of earthwork was calculated using a typical section of the channel to be <br />filled. The actual channel varies in depth and width and therefore required substantially more <br />dirt to fill. Also, the storm sewer pipe required an additional amount of dirt to provid(' sufficient <br />cover over the north end of the pipe. <br /> <br />The water line adjustment is required due to a conflict in grades between the existing water line <br />and the proposed storm. sewer line. Without this adjustment, it would have been required for the <br />stonn sewer line to be installed at a greater depth resulting in significantly more trench safety and <br />increasing the length of the pipe. <br /> <br />B. Frank Davis, Jr., P.E., R.P.L.S. <br />Project Manager <br />Bucher, Wills & Ratliff Corporation <br />601 Shelley Drive, Suite 202 <br />Tyler, Texas 75701-9439 <br /> <br />Telephone: <br />Fax: <br />E-mail: <br /> <br />903-581-7844 <br />903~581-0178 <br />bdavis@bwrcorp.com <br /> <br />.601 SHEllEY DRIVE, SUITE 202 . TYLER, TEXAS 75701-9439.903/5/31-7844. FAX: 903/581-0176. <br />
The URL can be used to link to this page
Your browser does not support the video tag.