My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-199-RES REJECTING ALL BIDS FOR THE RECONSTRUCTION AND CONVERSION OF THE UARCO BUILDING
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2004
>
2004-199-RES REJECTING ALL BIDS FOR THE RECONSTRUCTION AND CONVERSION OF THE UARCO BUILDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:27:50 PM
Creation date
11/24/2004 9:03:12 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2004
Doc Type
Resolution
CITY CLERK - Date
11/8/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(h) <br />(I) <br /> <br />Mechanical/HV AC <br />Painting <br /> <br />(q) <br /> <br />Fire Protection <br /> <br />11. Personnel to be assigned: The names, construction experience, specific capabilities, number <br />of personnel (with designation of full-time and/or part-time), and present commitment of the <br />key individuals (Project Manager, Construction Superintendent, Assistant Construction <br />Superintendent, Field Engineers, etc.) proposed to be utilized on this project from beginning <br />of work through completion of construction. <br /> <br />12. Past relationship with Owner: Consider all past projects that have been constructed for <br />Owner and the success of those projects. <br /> <br />13. Ease of accessability to key personnel: How accessible to the project in terms of travel time <br />key personnel will be. <br /> <br />Relative Weie:htine: of Selection Criteria <br /> <br />B. Price - percent (_ %) <br /> <br />C. Construction time - percent (_ %) <br /> <br />D. <br /> <br />Record of completing on time - <br /> <br />percent (_ %) <br /> <br />E. <br /> <br />Safety record and program - <br /> <br />percent (_ %) <br /> <br />F. Quality control- percent (_%) <br /> <br />G. Financial resources - percent (_ %) <br /> <br />H. Cost reduction suggestions - percent (- %) <br /> <br />I. <br /> <br />References - <br /> <br />percent (_ %) <br /> <br />J. <br /> <br />Experience and qualifications - <br /> <br />percent (_ %) <br /> <br />K. Subcontractors - percent (_ %) <br /> <br />L. Personnel - percent (_ %) <br /> <br />M. Past relationship - percent (_ %) <br /> <br />N. Ease of accessibility - percent (_ %) <br /> <br />TOTAL (must equal 100%) <br /> <br />percent (_ %) <br /> <br />B. Proposals shall be publicly opened, and the names of each Proposer shall be read aloud together with <br />all prices stated in each proposal. <br /> <br />C. Within forty-five (45) days after the proposals are opened. Owner or its designated representatives <br />shall evaluate and rank each proposal submitted in relation to the published selection criteria and <br />weighting. <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.