Laserfiche WebLink
located to protect him frorn clairns under worker's or workmen's compensation acts <br />and other employee benefit acts, claims for darnages because of bodily injury, <br />including death, and from claims for darnages, other than to the work itself, to property <br />which may arise out of or result from the Contractor's operations under this Contract, <br />whether such operations be by himself or by any subcontractor or anyone directly or <br />indirectly employed by any of thein. This insurance shall be written for not less than <br />the limits of liability stated within this Contract, or required by law, whichever is the <br />greater, and shall include contractual liability insurance applicable to the Contractor's <br />obligations. <br />16.2 Certificates of such insurance shall be filed with Owner prior to the commencement of <br />the work. Certificate(s) shall be on AIA 01705, 1978, Certificate of Insurance or other <br />foram containing same information. Contractor must also provide actual insurance <br />contracts to owner. <br />163 Contractor shall from the date of commencement until date of final acceptance include <br />Owner as an "Additional Insured" on all Contractor's insurance policies required by <br />this Contract <br />16.4 Owner and Contractor waive all rights against each other for darnages caused by fire or <br />other perils to the extent covered by insurance obtained pursuant to this Article or any <br />other property insurance applicable to the work, except such rights as they may have to <br />the proceeds of such insurance held by Owner as trustee. Contractor shall require <br />similar waivers in favor of Owner and the Contractor by subcontractors and <br />sub -subcontractors. <br />16.5 Contractor shall provide owner an irrevocable perfon-nance bond in an amount equal <br />to the contract arnount to ensure all work is completed. <br />ARTICLE 17 - CHANGES IN THE WORK: <br />17.1 Owner, without invalidating the Contract, may order changes in the work consisting of <br />additions, deletions, or modifications, the Contract Sum and the Contract Time being <br />adjusted accordingly. All such changes in the work shall be authorized by written <br />Change Order signed by Owners representative. <br />17.2 The Contract Sum and the Contract Time may be changed only by Change Order. <br />17.3 The cost or credit to Owner from a change in the work shall be either of the following <br />methods: <br />• Lump -Sura Amount signed by both Owner's and Contractor's representatives, <br />• An agreed Scope of Work signed by both Owner and Contractor with the <br />Compensation Amount to be determined by "Actual Cost" of the work plus 15% <br />Percent unless it involves a unit price stipulated on the bid form. <br />CONTRACT - 9 <br />