Laserfiche WebLink
<br />Summit Consultants, Inc. <br /> <br />Principal Engineer/Steve O'Kelley $ <br />Principal Engineer/Brian Richards $ <br />Staff Engineer/J. Jones $ <br />Staff Engineer/]. William $ <br />Staff Engineer/D. Graves $ <br />Staff Engineer/C. Thelen $ <br />Staff Engineer/G. Beaubouef $ <br />Staff Engineer/Mechanical Engineer $ <br />Staff Engineer/Electrical Designer $ <br />Staff Engineer/Mechanical Designer$ <br />Draftsman/CADD Tech. $ <br />Administrative Staff $ <br />Travel Time $ <br />All reimbursable $ <br /> <br />Omega Southwest <br /> <br />. Rate schedule attached. <br /> <br />123.20/hour <br />89.07/hour <br />8 1. 2 O/hour <br />74,20/hour <br />56.00/hour <br />64.60/hour <br />50AO/hour <br />70.00/hour <br />50AO/hour <br />50AO/hour <br />42.00/hour <br />33.60/hour <br />50% of hourly rate <br />actual cost plus 10% <br /> <br />, <br />;' <br />"i'd <br />l <br /> <br />I <br />'I <br /> <br />I' <br />I I <br /> <br />These rates are the best information available to date and are not audited rates. <br />Rates do correspond to experience and position in the respective fields. Historic <br />preservation is a specialty field and individuals with the profeSSional experience <br />levels required to complete the Rehabilitation of the Santa fe-Frisco Depot are not <br />widely available. <br /> <br />Thank You, <br /> <br />A. J. Garza, AlA <br /> <br />ARCHITECTIJRE <br /> <br />MASTER PLANNING <br /> <br />, ' <br /> <br />I <br />I <br />Jli. <br /> <br />I <br />I <br /> <br />PRESERVATION <br /> <br />" <br />i~ j <br />I' <br />I" <br /> <br />DESIGN-BUILD <br />