Laserfiche WebLink
<br />ABATEMENT MANAGEMI!:NT <br /> <br />Ad'."o,-oonlait,;ng buildin, material. <br />Sp<cifications and Oid Package <br />Walk-through with Contmclors and Conlruc!Q{ Selection <br />One trip to Paris <br />tI second trip to Paris lor contraC/or soloc;,I(ft. <br />would involve an additional $;15Q. <br />Pre.abatement Air Monitoring <br />Pcrfonned duriD8 conlmctor walk-through <br />AddiliolltJl silo vIsit specifically for monllOrltlg-$400 <br />Site Managentent and Moniloring During Abatentent <br />Daily Overvkw During Prep <br />Daily avervlow Durlllg Removal (Includes analysis 01 <br />10 area samples with 24 hour tum-cuound,- otherwise, <br />there Is CUI additional charge of $20 pe' swnpk) <br />Final Air Clearance TesUng <br />No charge for peM o.nalyses <br />TEM Atlalysl.$ (mayor may nol be requlred)- <br />$120 per sample (minimum 5 samples per arell) <br />SwnmlU)'Rcport and Followup OJ! Proper <br />Dlsposall'Iuctices by the COnltllClor <br /> <br />L"ad-ba."d falllt <br />SpecificatiOns and Bid Package <br />Walk-through with ConlJllctotS and Coolruclor Selection <br />If perfonned lI5 part of the llSbestos abatement COlIlJ8clor <br />serection or on same day <br />O,Ullrlp to Paris jo, lead aba1emelll contractOr selection - $300 <br />A second trip to Paris jor lead abaJemt'nJ conlrlll;tOr setectiQn <br />would involve an additional -$250 <br />Pre-abatcmenl Air Monitoring <br />Perfonned during conlIaClO{ W8/k-lhrou~ <br />Mditional site: visit speclftcally for monJtOring-$4oo <br />Site Management and OSHA Mowloring During Abatement <br />Site Overview During Prep-may not be required <br />Initial Couple Days of Abatunelll and <br />O,u;e a Week Slle Monitoring Overview <br />During Removal <br />ServIces <br />Anulylical fees ($35/sample) <br />Final Air Cleat'llllce Testing <br />SumntlU)' Report and Followup on Proper <br />Disposa1 Plll.Ctices by tbe ContraclOl' <br /> <br />$600 <br />300 <br /> <br />I <br />I <br />I' <br />id <br /> <br />'i( <br /> <br />225 <br /> <br />350 <br /> <br />I: <br />I'i <br /> <br />550 <br />350 <br /> <br />600 <br />4.50 <br /> <br />$400 <br /> <br />" <br />, ' <br />I I <br /> <br />150 <br /> <br />225 <br /> <br />350 <br /> <br />500 <br /> <br />350 <br />3.50 <br /> <br />The cost for ab3lemeUlllUlll"ll"""'lIt wiJIlkpcDd moolly OD lb... lIUIllbc;r of da)'o antioipau:d .0 I"'d'ooo the <br />abatement. Wllboutllll'ol'lJl.ltloD" 10 tho ..,.leal of the material which ""'y ""Iuj", ebulcmalt, the... cooto CM <br />be hiShly voriable (ranpnll from Iwo day. to 6 wocb), <br /> <br />\ <br />J;!. <br /> <br />I <br />I <br /> <br />i'l, <br />I.', <br />