<br />2.6.4 The Architect shall be a representative of and shall advise <br />:lIld consult wirh rhe Owner (I) during COo.'Hruction until final <br />payment to the ContractOr is due, and (2) as an Addition:d Ser~ <br />vice at the Owner's direction from time to tlme during the cor- <br />recrion period described in the Coner-Jet for Construction. The <br />Architect shall have authority to act on behalf of rhe Owner <br />only to the extent provided in this Agreement unless otherwise <br />modified b)' written instrument. <br /> <br />2.6.5 The Architecr shall \'isir rhe site ar intervals appropriate <br />to the stage of construction or as otherwise agreed hy the <br />Owner and Architect in writing ro become generally famili;tr <br />wirh the progress and quality of the Work completed and to <br /> <br />determine in general if the Wark is being performed in a man. <br />ner indicating lh~t the \Vork when completed will be in accor- <br />dance with the Contract Documents, However, the Architect <br />shall not be required to make exhaustive or continuous on-site <br />inspections to check the quality or quantiry of the Work. On <br />the basis of on-sire ohservations as an architect, rhe Architect <br />shall keep the Owner informed of the progress and qualit}' of <br />rhe Work, and shall endeavor to gUJId the Owner agaimt <br />defects and deficiencies in the Work. (More extensit'e site <br />representation may be agreed to as an Additional Service, as <br />descn'bed in Paragraph 3.2.) <br /> <br />2.6,6 The Architect shall nor have control ov~r or charge of <br />:md shall nOt be responsible for construction means, methods, <br />tet.hniques, sequences or procedures, or for safety precautions <br />and programs in connection wirh the Work, since these are <br />solely the Contractor's responsibility under the Contnct for <br />Construction. The Architect shall not be responsible for the <br />Contractor's schedules or failure to CJIry our the Work in ;lccor- <br />dance with the Contract Documents. The Architect shall not <br />have control over or charge of acts or omissions of the Contrac- <br />tor, Subcontractors, or their agents or employees, or of Jny <br />other persons performing portions of the Work. <br />2.6.7 The Architect shall at all times ha\'e access to the Work <br />wherever it i'i in preparation or progress. <br /> <br />2.6.8 Except as may otherwise be provided in the Conrr;lCt <br />Documents or when direct communications have heen spe- <br />cially authorized, the Owner and Contr:lctOr shall communicate <br />through the Architect. Communicnions by and with the Archi. <br />teet's consultams shall be through the Architect. <br /> <br />2.6.9 13:L'icd on the ArChitect's obseC'o.ations and evaluations of <br />the Contractor's Applications for Payment, the Architect shall <br />review and cenify the amoums due the Contractor. <br /> <br />2.6.10 The Architect's certification for paymem shall consti. <br />ture a representation to the Owner, based on the Architect's <br />observations at the site as provided in Subparagraph 2.6.5 and <br />on the dau comprising the Contractor's Application for P:.lY- <br />mem, that, to the beSt of the Architect's knowledge, informa- <br />tion and belief, the Work has progressed to the point indicated <br />and the quality of \'\brk is in accordance with the Contract <br />Documents. The foregoing representations are subject to :m <br />evalw.tion of the Work for conformance with the Contract <br />Documents upon Substantial Completion, to result~ of subse- <br />quent tests and inspections. ro minor deviations from the Con- <br />tract Documents correctable prior to completion and to spe- <br />dflc qualifications expressed by the Architect. The issuance of a <br />Certificate for Paymenr shall further conSlitute a representation <br />that the Contractor is emided to payment in the amount certi- <br />fied. However, the issuance of a Certificate for Payment shall <br />nO[ be a representation that the Architect has (1) made exhaus- <br />tive or cominuous on-sire inspections to check the quality or <br /> <br />quantity of the Work, (2) reviewed construction means, meth- <br />ods, techniques, sequences or procedurcs, (3) reviewed copies <br />of requisitions received from Subcontractors and material sup- <br />pliers and mher dara requested by the Owner to substantiate <br />Ihe Contractor's right to payment or (4) ascertained how or for <br />what purpose the Contractor has used money previously paid <br />on :J.ccoum of the Contr.lct Sum. <br /> <br />, <br />.1 <br />"J <br />" <br /> <br />2.6.11 The Architect shall have aurhority (0 reject Work which <br />docs nO[ conform to the Contract Documents. 'X'henever the <br />Ar::hitect considers it necessary or advisable for implementa- <br />tion of the inrent of the Comract Document.'i, the Architect will <br />h:lVC authority to require additional inspection or testing of the <br />\X:'ork in accordance with the provisions of the Contr:J.ct Doeu- <br />mems, whether or not such Work is fabricared, installed or <br />completed. Hc)wever, neither this authority of the ArchiteCt nor <br />:t decision made in good f:tith either to exercise or nOI to exer. <br />cise such authority shall give rise to a duty or responsibility of <br />the Architect to tbe ContractOr, SubcontractOrs, material and <br />equipment suppliers, rheir agents or employees or other per- <br />som performing portions of the Work. <br /> <br />2.6.12 The Architect shall review and approve or take other <br />appmpriare u.ction upon COOlractor's submittals such as Shop <br />Drawings, Product Data and Samples, but only for the limited <br />purpose of checking for conformance with information given <br />and the design concept expressed in the Contract Documents. <br />The A.rchitecr's acrion shall be taken with such reasonable <br />promptness as to cause no delay in the Work or in the con- <br />struction of the Owner or of separate contractors, while allow- <br />ing sufficienr time in the Architect's profeSSional judgment to <br />permit adequate review. Review of such submittals is not coo- <br />Liucted for the purpose of determining the accuracy and com- <br />pleteness of other de~s such as dimensions and quantities or <br />for stlbstantiating instructions for install:nion or perfonnance of <br />equipment or systems designed by the Contractor, all of which <br />remain the responsibility of the Contractor to the extent <br />required by the Contract Documents. The Architect's review <br />sll:tll not constitute approval of safery precautions or, unless <br />olhcf\vise specifically stated hy the Architect, of construction <br />me.ms, methods, techniques, sequences or procedures. The <br />Architect's approval of a specific item shall nm indicate <br />appro\'al of :m as.sembly of which the item is a component. <br />,",'nen professional certification of performance char.tcteristics <br />of materials, systems or equipmem IS required by the Contract <br />Documents, the Architect shall be emitled to rel)' upon such <br />(cnification to establish that the materials, systems or equip- <br />ment will meet the performance criteria required by the <':on- <br />Iract Documents. <br /> <br />, ' <br /> <br />2.6.13 The Architect shall prepare Change Orders and Con- <br />~[rucuon Ch:mge Directives, with supporting documentation <br />and d:lJJ if deemed necessary by the Architect as provided in <br />Subparagraphs 3.1.1 and 3.3.3, for the Owner's approval and <br />cxecution in accordance with the Contract Documents, and <br />may authorize minor changes in the Work not involving an <br />:Jdiustment in the Contract Sum or an extension of the Contract <br />Time which are nOt inconsistent with the intent of the Contr.1ct <br />Documents. <br /> <br />2.6.14 The Architect shall conduct inspections to determine <br />the date or cbtes of Subsuntial Completion and the due of fmal <br />completion, shall receive and forw;lrd to the Owner for the <br />Owner's review :rnd records \vcirtcn warranties and related <br />documents required by the Contract Documents and assem- <br />bled b)' the Contractor, and shall issue a final O.:rtifiC'.tte for Pay- <br />ment upon compliance with the requirements of the COntr.1ct <br />Documents. <br /> <br />I. <br /> <br />3 6141-1987 <br /> <br />AlA DOCUMENT 8141 . OWNER.ARCHITECT AGREEMDIT. FOURTEENTH EDITlON. AlA- . @1987 <br />THE AMERICAN INSTtTtTE OF .'RCHtTECTS, t 735 ;-JEW YORK AVENUE, :'II,W., WASHINGTON, D,C. 20006 <br /> <br />WARNING: Unlicensed photocoP'llng viollltll$ US. copyl1ght 18W1IIInd Is subject to legal prosecution. <br /> <br />i'I' <br />'Ii <br />1 <br />