My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-043-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-045 AWARDED
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1996
>
1996-043-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-045 AWARDED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:31:43 PM
Creation date
4/6/2005 4:33:53 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1996
Doc Type
Resolution
CITY CLERK - Date
5/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 96-043 <br /> <br />WHEREAS, the City Council of the City of Paris did heretofore, in Resolution <br />No. 94-045, award the contract for Water Treatment Plant Expansion Vol. II - Controls <br />& Instrumentation, being a part of Project 92WSRB03-92 to ED WILSON, INC.; and, <br /> <br />WHEREAS, the City Engineer, Earl Smith, acting as projcct engineer of said <br />projcct recommends the amendment of said contract by Change Order No. One and Final <br />attached hereto as Exhibit "A", which provides for a net increase in contract price of <br />$2,710.36 for the purpose of making modifications to Pat Mayse Pumping Station RTU <br />#1; Booster/High Service Pump Station RTU #2; Local Operations - Program Additions; <br />Local Operations, alarm Annunciator - Program Additions; Hardware Additions; Hardware <br />Installation; Additional Travel Expenses; Pat Mayse/Lake Crook Ratio Calculator; <br />Automatic Filter Backwash Initiation; GPM conversion on flow meters; Totalize Ground <br />Storage Flow Meter; Chemical Feed Rate Adjustment Capability; Ground Storage Pump <br />Control Logic; Turbidity Meters; and Control Signal to Backwash Turbidimeter Solenoid, <br />for a total contract price of $367,710.36, and such form should be approved, and the <br />Mayor should be authorized to execute the same; NOW, THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL 01<' THE CITY OF PARIS, that <br />the Water Treatment Plant Expansion Vol. II - Control & Instrumentation, being a <br />part of Project 92WSRB03-92, contract is hereby amended by Change Order No. One <br />and I<'inal attached hereto as Exhibit" A", providing for a net increase in contract price <br />of $2,710.36 for the purpose of making modifications to Pat Mayse Pumping Station RTU <br />#1; Booster/High Service Pump Station RTU #2; Local Operations - Program Additions; <br />Local Operations, alarm Annunciator - Program Additions; Hardware Additions; Hardware <br />Installation; Additional Travel Expenses; Pat Mayse/Lake Crook Ratio Calculator; <br />Automatic Filter Backwash Initiation; GPM conversion on flow meters; Totalize Ground <br />Storage Flow Meter; Chemical Feed Rate Adjustment Capability; Ground Storage Pump <br />Control Logic; Turbidity Meters; and Control Signal to Backwash Turbidimeter Solenoid, <br />for a total contract price of $367,710.36, which is in all things approved; and, <br /> <br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. <br />Clifford, be, and he is hereby authorized and directed on behalf of the City of Paris to <br />execute said Change Order No. One and Hnal. <br /> <br />PASSED AND ADOPTED this 13th day of May, 1996. <br /> <br />E~::> <br /> <br />ATTEST; <br /> <br />~~"...~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.