<br />RESOLUTION NO. 96-042
<br />
<br />WHEREAS, the City Council of the City of Paris did heretofore, in Resolution
<br />No. 94-110, award the contract for the Water Treatment Plant Expansion, 92WSRB03-
<br />92 Project to ARCHER-WESTERN CONTRACTORS, LTD.; and,
<br />
<br />WHEREAS, the City Engineer, Earl S. Smith, acting as project engineer of said
<br />project recommends the amendment of said contract by Change Order No. Three and
<br />,,'inal attached hereto as Exhibit" A", which provides for a net decrease in contract price
<br />of $39,560.69 for the purpose of making modifications to Installation of Turbidity
<br />Backwash sensor; Training Room conduit runs and wiring; lime silo control panel;
<br />installation of additional conduit and wiring for turbidity meters, particle counters and Pratt
<br />Actuators; extra work on a time and material basis to the Filter Building West Stairway;
<br />extra work on a time and material basis on the existing grouted joints in the underdrain of
<br />Filter No.1; extra work on a time and material basis for the addition of canopy to front
<br />entryway of main building; and deleting Item 1455, patching existing asphalt; Item 17,
<br />extra 3,000 PSI Concrete; Item 18, extra 2,000 PSI Concrete; Item 19, extra crushed stone
<br />and extra foundation pier footage; Item 21 extra handrail; and Item 22, extra filter
<br />underdrain, for a total of $4,806,281.37, and such form should be approved, and the
<br />Mayor should be authorized to execute the same; NOW, THEREFORE,
<br />
<br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY 01<' PARIS, that
<br />the Water Treatment Plant Expansion, 92WSRB03-92 Project, contract is hereby
<br />amended by Change Order No. Three and Final attached hereto as Exhibit "A",
<br />providing for a net decrease in contract price of $39,560.69 for the purpose of making
<br />modifications to Installation of Turbidity Backwash sensor; Training Room conduit runs
<br />and wiring; lime silo control panel; installation of additional conduit and wiring for
<br />turbidity meters, particle counters and Pratt Actuators; extra work on a time and material
<br />basis to the Filter Building West Stairway; extra work on a time and material basis on the
<br />existing grouted joints in the underdrain of Filter No.1; extra work on a time and material
<br />basis for the addition of canopy to front entryway of main building; and deleting Item
<br />1455, patching existing asphalt; Item 17, extra 3,000 PSI Concrete; Item 18, extra 2,000
<br />PSI Concrete; Item 19, extra crushed stone and extra foundation pier footage; Item 21
<br />extra handrail; and Item 22, extra filter underdrain, for a total of $4,806,281.37, which
<br />is, in all things, approved; and,
<br />
<br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S.
<br />Clifford, be, and he is hereby, authorized and directed, on behalf of the City of Paris, to
<br />execute said Change Order No. Three and Final.
<br />
<br />PASSED AND ADOPTED this 13th day of May, 1996.
<br />
<br />I
<br />
<br />~
<br />
<br />Eric S. Clifford, Mayor
<br />
<br />ATTEST:
<br />
<br />\ \'