<br />RESOLUTION NO. 96-042 <br /> <br />WHEREAS, the City Council of the City of Paris did heretofore, in Resolution <br />No. 94-110, award the contract for the Water Treatment Plant Expansion, 92WSRB03- <br />92 Project to ARCHER-WESTERN CONTRACTORS, LTD.; and, <br /> <br />WHEREAS, the City Engineer, Earl S. Smith, acting as project engineer of said <br />project recommends the amendment of said contract by Change Order No. Three and <br />,,'inal attached hereto as Exhibit" A", which provides for a net decrease in contract price <br />of $39,560.69 for the purpose of making modifications to Installation of Turbidity <br />Backwash sensor; Training Room conduit runs and wiring; lime silo control panel; <br />installation of additional conduit and wiring for turbidity meters, particle counters and Pratt <br />Actuators; extra work on a time and material basis to the Filter Building West Stairway; <br />extra work on a time and material basis on the existing grouted joints in the underdrain of <br />Filter No.1; extra work on a time and material basis for the addition of canopy to front <br />entryway of main building; and deleting Item 1455, patching existing asphalt; Item 17, <br />extra 3,000 PSI Concrete; Item 18, extra 2,000 PSI Concrete; Item 19, extra crushed stone <br />and extra foundation pier footage; Item 21 extra handrail; and Item 22, extra filter <br />underdrain, for a total of $4,806,281.37, and such form should be approved, and the <br />Mayor should be authorized to execute the same; NOW, THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY 01<' PARIS, that <br />the Water Treatment Plant Expansion, 92WSRB03-92 Project, contract is hereby <br />amended by Change Order No. Three and Final attached hereto as Exhibit "A", <br />providing for a net decrease in contract price of $39,560.69 for the purpose of making <br />modifications to Installation of Turbidity Backwash sensor; Training Room conduit runs <br />and wiring; lime silo control panel; installation of additional conduit and wiring for <br />turbidity meters, particle counters and Pratt Actuators; extra work on a time and material <br />basis to the Filter Building West Stairway; extra work on a time and material basis on the <br />existing grouted joints in the underdrain of Filter No.1; extra work on a time and material <br />basis for the addition of canopy to front entryway of main building; and deleting Item <br />1455, patching existing asphalt; Item 17, extra 3,000 PSI Concrete; Item 18, extra 2,000 <br />PSI Concrete; Item 19, extra crushed stone and extra foundation pier footage; Item 21 <br />extra handrail; and Item 22, extra filter underdrain, for a total of $4,806,281.37, which <br />is, in all things, approved; and, <br /> <br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. <br />Clifford, be, and he is hereby, authorized and directed, on behalf of the City of Paris, to <br />execute said Change Order No. Three and Final. <br /> <br />PASSED AND ADOPTED this 13th day of May, 1996. <br /> <br />I <br /> <br />~ <br /> <br />Eric S. Clifford, Mayor <br /> <br />ATTEST: <br /> <br />\ \' <br />