Laserfiche WebLink
<br />Contractor Selection <br />Construction <br />Completion <br /> <br />2 Months <br />9 Months <br />1 Month <br /> <br />Statewide Transportation Enhancement Program <br /> <br />Page B6 <br /> <br />XI. ITEMIZED BUDGET. List below a schedule of itemized activities and the cost of each activity. <br />Provide as much detail as possible. <br /> <br />DESCRIPTION OF WORK <br /> <br />BUDGET <br />ESTIMATE <br /> <br />$ 158,010.00 <br /> <br />DIVISION 1 GENERAL REQUIREMENTS <br />SCHEDULES, REPORTS, & PAYMENTS, SHOP DRAWINGS, SUBMIITALS, <br />TESTING, QUALITY CONTROL SERVICES, TEMPORARY FACILITIES <br />PROJECT COMPLETION, HAZARDOUS MATERIALS MITIGATION <br />DIVISION 2 SITEWORK <br />ASPHALTIC PAVING, SIDEWALKS, SITE DRAINAGE, SEWAGE PIPING <br />LANDSCAPING & DEMOLITION <br />DIVISION 3 CONCRETE <br />CONCRETE, SELF-LEVELING UNDERLAYMENTS <br />DIVISION 4 MASONRY <br />REPAIR AND REPLICATION, CLEANING <br />DIVISION:5 METALS <br />STRUCTURAL STEEL, METAL FRAMING & FABRICATIONS, <br />ORNAMENTAL METALS <br />DIVISION 6 WOOD III PLASTICS <br />ROUGH CARPENTRY, FINISH CARPENTRY <br />DIVISION 7 THERMAL III MOISTURE <br />BITUMINOUS MEMBRANE WATERPROOFING, INSULATION, ROOFING, <br />FLASHING, JOINT SEALERS <br />DIVISION 8 DOORS III WINDOWS <br />WOOD DOORS, WOOD WINDOWS, DOOR HARDWARE, <br />WINDOW HARDWARE, GLAZING <br />DIVISION 9 FINISHES <br />PLASTER, GYPSUM BOARD, TILE, WOOD FLOORING, RESILIENT FLOORING <br />PAINTING, WALL COVERINGS, WOOD REFURBISHMENT <br />DIVISION 10 SPECIALTIES <br />TOILET COMPARTMENTS & ACCESSORIES <br />DIVISION 11 EQUIPMENT III FURNISHINGS <br />NOT USED <br />DIVISION 14 CONVEYING SYSTEMS <br />HYDRAULIC ELEVATOR & FIRE ESCAPES <br />DIVISION IS MECHANICAL <br />MECHANICAL, INSULATION, FIRE PROTECTION, PLUMBING, <br />HVAC, TESTING <br />DIVISION 16 ELECTRICAL <br />ELECTRICAL MATERIALS & METHODS, SERVICE, <br />LIGHTING, LIGHTING CONTROLS <br /> <br />TOTAL ESTIMATED CONSTRUCTI<;!N .cOST <br /> <br />DESIGN,ENGINEERING, CONTINGENCIES, TXDOT ADMINISTRATIVE <br />EXPENSEAND OTHER COSTS ASSOCIATED WITH THE DEVELOPMENT <br />AND IMPLEMENTATION <br /> <br />$ 46,161.00 <br />$ 569.25 <br />$ 15,611.25 <br />$ 0.00 <br />$ 103,212.50 <br />$ 107,870.00 <br />$ 50,181.40 <br />$ 172,103.25 <br />$ 8,337.50 <br />$ 0.00 <br />$ 0.00 <br />$ 153,122.50 <br />$ 112.245.75 <br /> <br />$ 927,424,40 <br /> <br />L.lli9.484.88 <br />