My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-015-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-110 AWARDED
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1996
>
1996-015-RES WHEREAS, CITY COUNCIL DID HERETOFORE IN RESOLUTION NO 94-110 AWARDED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:31:58 PM
Creation date
4/6/2005 5:58:54 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1996
Doc Type
Resolution
CITY CLERK - Date
2/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. <br /> <br />96-015 <br /> <br />WHEREAS, the City Council of the City of Paris did heretofore, in Resolution <br />No. 94-110, award the contract for the Water Treatment Plant Expansion, 92WSRB03- <br />92 Project to ARCHER-WESTERN CONTRACTORS, LTD.; and, <br /> <br />WHEREAS, the City Engineer, Earl S. Smith, acting as project engineer of said <br />project recommends the amendment of said contract by Change Order No. Two attached <br />hereto as Exhibit" A", which provides for a net increase in contract price of $32,288.38 <br />for the purpose of making modifications to electrical ductbank at North Chemical Building; <br />the addition of exterior lighting on west side of existing Filter Building; making <br />modifications to the painting of various existing concrete structures; making modifications <br />to the painting of various new concrete structures; making modifications to the Transfer <br />Pumps Power Supply wiring; and making modifications to the transfer pumps RTD's and <br />Space Heater Wiring, for a total of$4,845,842.06, and such form should be approved, and <br />the Mayor should be authorized to execute the same; NOW, THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that <br />the Water Treatment Plant Expansion, 92WSRB03-92 Project, contract is hereby <br />amended by Change Order No. Two attached hereto as Exhibit" A ' , providing for a net <br />increase in contract price of $32,288.38 for the purpose of making modifications to <br />electrical ductbank at North Chemical Building; the addition of exterior lighting on west <br />side of existing Filter Building; making modifications to the painting of various existing <br />concrete structures; making modifications to the painting of various new concrete <br />structures; making modifications to the Transfer Pumps Power Supply wiring; and making <br />modifications to the transfer pumps RTD's and Space Heater Wiring, for a total of <br />$4,845,842.06, which is, in all things, approved; and, <br /> <br />BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S. <br />Clifford, be, and he is hereby, authorized and directed, on behalf of the City of Paris, to <br />execute said Change Order No. Two. <br /> <br />PASSED AND ADOPTED this 12th day of February, 1996. <br /> <br /> <br />Eric S. Clifford, Mayor <br /> <br />ATTEST: <br /> <br />~~,~,~~~~~~ <br />Mattie Cunningham, City C rk <br /> <br />APPROVED AS T9' FORM: <br />
The URL can be used to link to this page
Your browser does not support the video tag.