Laserfiche WebLink
<br />Attachment to Change Order No.2 <br />Paris, Texas - Water Treatment Plant Expansion <br />Vol. I. Expansion <br /> <br />Under the terms of the above referenced contract, the following modifications in the scope of work <br />are submitted. <br /> <br />DESCRIPTION <br /> <br />PRICE CHANGE <br /> <br />1. <br /> <br />Make modifications to electrical ductbank at North <br />Chemical Building as detailed by letter dated <br />November 13,1995 ......................................... Deduct <br /> <br />$ 591.00 <br /> <br />2. <br /> <br />Addition of exterior lighting on west side of existing <br />Filter Building as detailed by letter dated November 13, 1995 ....... Add <br /> <br />$ 2,572.00 <br /> <br />3. Make modifications to the painting of various existing <br />concrete structures as detailed by letter dated <br />December 19, 1995 .............................,........... Deduct $20,243.00 <br /> <br />4. Make modifications to the painting of various new <br />concrete structures as detailed by letter dated <br />December 19, 1995 ............................................ Add $22,841.00 <br /> <br />5. Make modifications to the Transfer Pumps <br />Power Supply wiring as detailed by letter <br />dated December 11, 1995. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Add $19,209.42 <br /> <br />6. <br /> <br />Make modifications to the transfer pumps <br />RID's and Space Heater Wiring as detailed <br />by letter dated January 3, 1996 ................................. Add <br /> <br />$ 8,499.96 <br /> <br />The estim3ted net amount increase in the contract amount due to Change Order No.2 is $32,288.38. <br />